Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
885601 (1) ·
885602 (1) ·
885605 (1) ·
885813 (1) ·
935501 (1) ·
936776 (1) ·
944008 (1) ·
945254 (1) ·
945260 (1) ·
945262 (1)
'.2MI S of LINDELL BLVD ' (1) ·
'0.3 Miles North of SR 60 ' (1) ·
'0.5MI Nof PT ST LUCIE BLD' (1) ·
'0.5Mi S of PAAR DRIVE ' (1) ·
'0.5MI W OF NW ST JAMES DR' (1) ·
'0.7MI S OF PAAR DRIVE ' (1) ·
'1.1MI N of CR 512 ' (1) ·
'1.2MI. W of US-1 ' (1) ·
'1.8MI N OF CR 510 ' (1) ·
'150FT N OF JOYHAVEN DR ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1)
Showing below up to 10 results in range #1 to #10.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)