Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'B-19 Canal / Trib 1 ' (1) ·
'C-18 Canal ' (1) ·
'CANAL E-4 ' (1) ·
'CANAL E-84 ' (1) ·
'Dirksen Dr ' (1) ·
'Dirksen Drive ' (1) ·
'Drainage Canal ' (1) ·
'EL RIO CANAL ' (1) ·
'Lake Ashby Canal ' (1) ·
'LATERAL CANAL L-5 ' (1) ·
'Main Relief Canal ' (1) ·
'North Lake ' (1) ·
'Spruce Creek ' (1) ·
'SR 706 & I-95/SR706 Ramp' (1) ·
'SR-91 Fl. Tpk ' (1) ·
'St Johns River ' (1) ·
'St. Johns River ' (1)
'66th Avenue ' (1) ·
'CAMINO GARDENS EB ' (1) ·
'CAMINO GARDENS WB ' (1) ·
'EB 706 To SB I-95 ' (1) ·
'EB North Lake Blvd' (1) ·
'Esplanade Avenue ' (1) ·
'GATEWAY BLVD (EB) ' (1) ·
'GATEWAY BLVD (WB) ' (1) ·
'I-4 EB ' (1) ·
'I-4 WB ' (1) ·
'Maytown Road ' (1) ·
'NB I 95 SR 9 ' (1) ·
'PALMETTO PK RD EB ' (1) ·
'PALMETTO PK RD WB ' (1) ·
'Pioneer Trail ' (1) ·
'SAVONA BLVD. ' (1) ·
'SB I 95 SR 9 ' (1) ·
'SR-520 EB ' (1) ·
'SR-520 WB ' (1) ·
'SR-76 (Kanner Hwy)' (1) ·
'SR91 N/S TPK 96.55' (1) ·
'WB N. Lake Blvd. ' (1) ·
'WB SR706 to SB I95' (1)
700200 (1) ·
700217 (1) ·
790042 (1) ·
790100 (1) ·
794118 (1) ·
794141 (1) ·
796413 (1) ·
884099 (1) ·
890141 (1) ·
930050 (1) ·
930195 (1) ·
930384 (1) ·
930386 (1) ·
930387 (1) ·
930390 (1) ·
930447 (1) ·
934464 (1) ·
934465 (1) ·
935209 (1) ·
935210 (1) ·
935307 (1) ·
935308 (1) ·
945259 (1)
'0.03Mi E of CYPRESS WAY ' (1) ·
'0.3 mile South of SR 706 ' (1) ·
'0.3MI E OF CONGRESS BLVD ' (1) ·
'0.4MI S OF PAAR DRIVE ' (1) ·
'0.76 MI SOUTH OF SR 80 ' (1) ·
'0.7Mi South of SR-60 ' (1) ·
'0.7MI W OF US-1 ' (1) ·
'0.7MI WEST OF US-1 ' (1) ·
'1.3 miles East of CR-415 ' (1) ·
'1.5mi East of Indiantown' (1) ·
'1mi. W of US-1. ' (1) ·
'1mi. West of US-1 ' (1) ·
'200FT N/O Cap Diville Ave' (1) ·
'4.8 miles East of SR-415 ' (1) ·
'I-4 EB - Dirksen Dr ' (1) ·
'I-4 WB - Dirksen Drive ' (1) ·
'I-95 / SR 706 Interchange' (1) ·
'South of Ramp to SR 706 ' (1) ·
'SR-520 EB-St. Johns River' (1) ·
'SR-520 WB -St Johns River' (1) ·
'Tpk. SR 706 Interchange ' (1)
26202775 (1) ·
26202815 (1) ·
26210134 (1) ·
26210174 (1) ·
26324784 (1) ·
26324847 (1) ·
26401030 (1) ·
26482760 (1) ·
26482851 (1) ·
26554700 (1) ·
26554800 (1) ·
26560369 (1) ·
26560606 (1) ·
27011358 (1) ·
27130199 (1) ·
27374280 (1) ·
28221009 (1) ·
28221061 (1) ·
28504680 (1) ·
28521781 (1) ·
28521801 (1) ·
29030188 (1) ·
29071179 (1)
80040089 (1) ·
80040198 (1) ·
80050886 (1) ·
80050888 (1) ·
80054881 (1) ·
80054885 (1) ·
80055287 (1) ·
80055288 (1) ·
80085515 (1) ·
80085650 (1) ·
80090683 (1) ·
80091289 (1) ·
80102169 (1) ·
80230070 (1) ·
80260193 (1) ·
80274780 (1) ·
80522244 (1) ·
80522246 (1) ·
81015661 (1) ·
81024737 (1) ·
81044532 (1) ·
81170324 (1) ·
81170430 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 23 results in range #1 to #23.