Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Banana River Drive ' (1) ·
'BOYNTON CANAL ' (1) ·
'BULLDOG CANAL ' (1) ·
'CANAL E-14 ' (1) ·
'CANAL E-84 ' (1) ·
'Drainage Canal Sand Cut ' (1) ·
'El Rio Canal (E-4) ' (1) ·
'L-38 CANAL ' (1) ·
'Lake Washington Road ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'LWDD L-30 CANAL ' (1) ·
'M CANAL ' (1) ·
'NORTH CANAL ' (1) ·
'SR 91 TPK ' (1) ·
'SR 91 TPK(FT PIERCE INT)' (1) ·
'TEN MILE CREEK ' (1) ·
'WEST PALM BEACH CANAL ' (1)
'36TH STREET ' (1) ·
'CR712 MDWYRD 150.3' (1) ·
'DARWIN BLVD ' (1) ·
'HAVERHILL ROAD ' (1) ·
'I-95 NB ' (1) ·
'INDIAN RIV BLVD NB' (1) ·
'INDIAN RIV BLVD SB' (1) ·
'JEANNE AVE ' (1) ·
'JOG RD NB ' (1) ·
'JOG ROAD (SB) ' (1) ·
'JOG ROAD NB ' (1) ·
'JOG ROAD SB ' (1) ·
'MERCER AVE ' (1) ·
'NORTH SHORE DRIVE ' (1) ·
'SHINN RD (CR-609A)' (1) ·
'SR 794 (Yamato Rd)' (1) ·
'SR-528 ' (1) ·
'SR-528 WB ' (1) ·
'SR91 SB TPK 152.9 ' (1) ·
'SW 18th STREET EB ' (1) ·
'SW 18TH STREET WB ' (1) ·
'US98&441 SR700&15' (1) ·
'W. CAMINO REAL ' (1)
700026 (1) ·
700113 (1) ·
700123 (1) ·
884058 (1) ·
884060 (1) ·
930015 (1) ·
930091 (1) ·
934256 (1) ·
934406 (1) ·
934900 (1) ·
934901 (1) ·
934913 (1) ·
934918 (1) ·
934938 (1) ·
934939 (1) ·
934952 (1) ·
937702 (1) ·
937704 (1) ·
937708 (1) ·
940027 (1) ·
940050 (1) ·
940053 (1) ·
945261 (1) ·
945262 (1)
'0.2Mi S of 45TH ST(CR702)' (1) ·
'0.4MI N OF SR-60 ' (1) ·
'0.4MI. N OF SR-60 ' (1) ·
'0.5Mi S of PAAR DRIVE ' (1) ·
'0.7MI N OF BOYNTON BH BL ' (1) ·
'0.7Mi S OF CR-702/45TH ST' (1) ·
'0.7MI Wof SW DARWIN BLVD.' (1) ·
'1.1 MILES NORTH OF SR-70 ' (1) ·
'1.9Mi S of WOOLBRIGHT ' (1) ·
'1MI S OF LINTON BLVD ' (1) ·
'1MI S. OF LINTON BLVD ' (1) ·
'2.55 Miles East of SR-3 ' (1) ·
'2.6 MI S OF FT PIER INTCH' (1) ·
'250FT N of BELVEDERE RD ' (1) ·
'4.1Mi N of WPB Canal ' (1) ·
'650FT E OF AUSTRALIAN AVE' (1) ·
'ADJ W SIDE MILITARY TRAIL' (1) ·
'AT SR-809 / WCAMINOREA ' (1) ·
'E Congress Ave. & W I-95 ' (1) ·
'FT PIERCE INTERCHANGE ' (1) ·
'I-95 NB -Lk Washington Rd' (1)
26195472 (1) ·
26195525 (1) ·
26203879 (1) ·
26233940 (1) ·
26252703 (1) ·
26252706 (1) ·
26290212 (1) ·
26290213 (1) ·
26322087 (1) ·
26412955 (1) ·
26444560 (1) ·
26450216 (1) ·
26450312 (1) ·
26550153 (1) ·
27130362 (1) ·
27130777 (1) ·
27222822 (1) ·
27234679 (1) ·
27243006 (1) ·
27392294 (1) ·
27392357 (1) ·
28084581 (1) ·
28241813 (1) ·
28241877 (1)
80040588 (1) ·
80041431 (1) ·
80044331 (1) ·
80055515 (1) ·
80070375 (1) ·
80074380 (1) ·
80074383 (1) ·
80074489 (1) ·
80084773 (1) ·
80084780 (1) ·
80084942 (1) ·
80085013 (1) ·
80085039 (1) ·
80212173 (1) ·
80220192 (1) ·
80230229 (1) ·
80230306 (1) ·
80230357 (1) ·
80240119 (1) ·
80282176 (1) ·
80364774 (1) ·
80394904 (1) ·
80394909 (1) ·
80422077 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 24 results in range #1 to #24.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)