Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BOYNTON CANAL ' (1) ·
'BULLDOG CANAL ' (1) ·
'C-104 CANAL ' (1) ·
'CANAL C-104 ' (1) ·
'CANAL-17 ' (1) ·
'E-2W Canal ' (1) ·
'El Rio Canal (E-4) ' (1) ·
'L-38 CANAL ' (1) ·
'LITTLE MUD CREEK ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'LWDD L-30 CANAL ' (1) ·
'M CANAL ' (1) ·
'WEST PALM BEACH CANAL ' (1) ·
Horse Creek (1)
'36TH STREET ' (1) ·
'DUNN ROAD ' (1) ·
'E/B Atlantic Ave. ' (1) ·
'HAVERHILL ROAD ' (1) ·
'JOG RD NB ' (1) ·
'JOG ROAD (SB) ' (1) ·
'JOG ROAD NB ' (1) ·
'JOG ROAD SB ' (1) ·
'NORTH SHORE DRIVE ' (1) ·
'Old Dixie Highway ' (1) ·
'PALMETTO PK RD ' (1) ·
'SELVITZ ROAD ' (1) ·
'SR 794 (Yamato Rd)' (1) ·
'SR A1A ' (1) ·
'SW 18th STREET EB ' (1) ·
'SW 18TH STREET WB ' (1) ·
'W. CAMINO REAL ' (1) ·
'W/B Atlantic Ave ' (1) ·
US-1 (1)
700206 (1) ·
930015 (1) ·
930359 (1) ·
930437 (1) ·
930440 (1) ·
934256 (1) ·
934406 (1) ·
934900 (1) ·
934901 (1) ·
934902 (1) ·
934913 (1) ·
934918 (1) ·
934938 (1) ·
934939 (1) ·
934952 (1) ·
937702 (1) ·
937704 (1) ·
940158 (1) ·
945270 (1) ·
945271 (1)
'0.2Mi S of 45TH ST(CR702)' (1) ·
'0.5MI S of CR 712 ' (1) ·
'0.5MI S of CR-712 ' (1) ·
'0.7MI N OF BOYNTON BH BL ' (1) ·
'0.7MI N of Northlake Blvd' (1) ·
'0.7Mi S OF CR-702/45TH ST' (1) ·
'1.9Mi S of WOOLBRIGHT ' (1) ·
'1MI S OF LINTON BLVD ' (1) ·
'1MI S. OF LINTON BLVD ' (1) ·
'650FT E OF AUSTRALIAN AVE' (1) ·
'ADJ W SIDE MILITARY TRAIL' (1) ·
'AT SR-809 / WCAMINOREA ' (1) ·
'Atlantic Ave./Fl. Tpk. ' (1) ·
'E Congress Ave. & W I-95 ' (1) ·
'NORTH OF BLIND CREEK ' (1) ·
US-1 over Horse Creek (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles by assessment, by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1)
Showing below up to 20 results in range #1 to #20.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)