Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'14TH STREET CANAL ' (1) ·
'Australian Avenue ' (1) ·
'Belvedere Road ' (1) ·
'BOYNTON CANAL ' (1) ·
'Bulow Creek ' (1) ·
'C-52 Canal ' (1) ·
'FEC RR(Olympia Overpass)' (1) ·
'FL. TPK. SR-91 ' (1) ·
'Florida Turnpike (SR-91)' (1) ·
'FLORIDA TURNPIKE SR-91 ' (1) ·
'JONES CREEK ' (1) ·
'LATERAL CANAL #30 ' (1) ·
'LEVEE NO.8 ' (1) ·
'Main Relief Canal ' (1) ·
'OUTFALL SLOUGH ' (1) ·
'SIMS CREEK ' (1) ·
'SR-91 (Fl. Tpk.) ' (1) ·
'WARNER CREEK ' (1) ·
'WPB STUB CANAL ' (1)
'27th Street ' (1) ·
'Becker Rd. ' (1) ·
'BELVEDERE RD ' (1) ·
'CENTER STREET ' (1) ·
'CR-603-IND RIV BLV' (1) ·
'DIXIE HIGHWAY ' (1) ·
'I 95 to PBIA Ramp ' (1) ·
'JOG ROAD ' (1) ·
'NB I 95 SR 9 ' (1) ·
'NB SR-5 (US-1) ' (1) ·
'PGA Blvd. (SR 786)' (1) ·
'SB SR-5 (US-1) ' (1) ·
'SR-60 EB ' (1) ·
'SR-60 WB ' (1) ·
'SR-714 ' (1) ·
'SR-80WB (Southern)' (1) ·
'SR91 N/S TPK 83.91' (1) ·
'SR91 N/S TPK 87.74' (1) ·
'SR91 NB TPK 178.03' (1) ·
'SR91 SB TPK 178.03' (1) ·
'Walter Boardman Ln' (1)
794126 (1) ·
880058 (1) ·
880066 (1) ·
880090 (1) ·
880091 (1) ·
884054 (1) ·
884077 (1) ·
890001 (1) ·
890021 (1) ·
890113 (1) ·
890159 (1) ·
930265 (1) ·
930407 (1) ·
930479 (1) ·
930486 (1) ·
931009 (1) ·
931010 (1) ·
934146 (1) ·
934147 (1) ·
934208 (1) ·
934297 (1) ·
941001 (1)
'0.1MI W OF I-95 ' (1) ·
'0.3 Mi. W of SE Bosko Dr ' (1) ·
'0.6MI NE OF INDIANTOWN RD' (1) ·
'0.7 MI NORTH OF SR-804 ' (1) ·
'0.8MI E of INDIANTOWN RD ' (1) ·
'0.9 mi E of Old Dixie Hwy' (1) ·
'1 mile North of SR 80 ' (1) ·
'1.0M S OF OKEECHOBEE BLVD' (1) ·
'1.2Mi. E of Savannah Rd. ' (1) ·
'1.4MI NORTH OF US-1 ' (1) ·
'130ft. S of Aviation Blvd' (1) ·
'15 MI S OF SR 60 ' (1) ·
'15 MI SOUTH OF SR 60 ' (1) ·
'2.12 MI NORTH OF SR-806 ' (1) ·
'2Mi West of CR-512 ' (1) ·
'2Mi. West of CR-512 ' (1) ·
'NB SR-5 1mi. S of CR 708 ' (1) ·
'PBIA/I-95 Interchange ' (1) ·
'PUMP STA AT 20 MI BEND ' (1) ·
'SB SR-5 1mi. S of CR 708 ' (1) ·
'Tpk/PGA Blvd interchange ' (1) ·
'Turnpike at Stuart exit. ' (1)
26290135 (1) ·
26322016 (1) ·
26410722 (1) ·
26411700 (1) ·
26412597 (1) ·
26412668 (1) ·
26420393 (1) ·
26502106 (1) ·
26562633 (1) ·
26562955 (1) ·
27023798 (1) ·
27023948 (1) ·
27094100 (1) ·
27123412 (1) ·
27132086 (1) ·
27333350 (1) ·
27333415 (1) ·
27373700 (1) ·
27382573 (1) ·
27382633 (1) ·
27385110 (1) ·
29242747 (1)
80035976 (1) ·
80041580 (1) ·
80042465 (1) ·
80070222 (1) ·
80070240 (1) ·
80070561 (1) ·
80071243 (1) ·
80074689 (1) ·
80085094 (1) ·
80102125 (1) ·
80102180 (1) ·
80135221 (1) ·
80181600 (1) ·
80200100 (1) ·
80214953 (1) ·
80224294 (1) ·
80242065 (1) ·
80403783 (1) ·
80403784 (1) ·
80434234 (1) ·
80434242 (1) ·
81071865 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 22 results in range #1 to #22.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)