Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Alamana Canal ' (1) ·
'Australian Ave and Canal' (1) ·
'Belvedere Road ' (1) ·
'C-52 Canal ' (1) ·
'FEC RR(Olympia Overpass)' (1) ·
'FL. TPK. SR-91 ' (1) ·
'Florida Turnpike (SR-91)' (1) ·
'FLORIDA TURNPIKE SR-91 ' (1) ·
'LATERAL CANAL #38 ' (1) ·
'LATERAL CANAL #45 ' (1) ·
'LEVEE NO.8 ' (1) ·
'Loxahatchee Slough ' (1) ·
'N CANAL ' (1) ·
'OUTFALL SLOUGH ' (1) ·
'SR-91 (Fl. Tpk.) ' (1) ·
'WILLOUGHBY CREEK ' (1)
'Becker Rd. ' (1) ·
'EB SR-710 ' (1) ·
'JOG ROAD ' (1) ·
'NB I 95 SR 9 ' (1) ·
'NB SR-5 (US-1) ' (1) ·
'PBIA to I-95 Ramp ' (1) ·
'PGA Blvd. (SR 786)' (1) ·
'SB SR-5 (US-1) ' (1) ·
'SE ST LUCIE BLVD ' (1) ·
'SR 91 TPK 79.75 ' (1) ·
'SR-415 ' (1) ·
'SR-60 EB ' (1) ·
'SR-60 WB ' (1) ·
'SR-714 ' (1) ·
'SR-80WB (Southern)' (1) ·
'SR91 N/S TPK 76.17' (1) ·
'SR91 N/S TPK 92.1 ' (1) ·
'SR91 NB TPK 178.03' (1) ·
'SR91 NB TPK 180.16' (1) ·
'SR91 SB TPK 178.03' (1) ·
'SR91 SB TPK 180.16' (1) ·
'VANDEGRIFT-WILL RD' (1) ·
'WB SR-710 ' (1)
790034 (1) ·
880058 (1) ·
880059 (1) ·
880066 (1) ·
880067 (1) ·
880090 (1) ·
880091 (1) ·
890001 (1) ·
890021 (1) ·
890102 (1) ·
890159 (1) ·
930215 (1) ·
930223 (1) ·
930265 (1) ·
930407 (1) ·
930412 (1) ·
930480 (1) ·
930486 (1) ·
930535 (1) ·
930536 (1) ·
934297 (1) ·
934506 (1) ·
941001 (1)
'0.3 Mi. W of SE Bosko Dr ' (1) ·
'1 mile North of SR 80 ' (1) ·
'1.0M S OF OKEECHOBEE BLVD' (1) ·
'1.2 MI NO OF LANTANA RD ' (1) ·
'1/2MI S of INDIAN ST. ' (1) ·
'13 MI S OF SR 60 ' (1) ·
'13 MI SOUTH OF SR 60 ' (1) ·
'15 MI S OF SR 60 ' (1) ·
'15 MI SOUTH OF SR 60 ' (1) ·
'1MILE E OF HATTON HWY ' (1) ·
'2 miles East of SR-786 ' (1) ·
'2 miles East of SR786 ' (1) ·
'2.0 MI SOUTH OF SR-806 ' (1) ·
'2Mi West of CR-512 ' (1) ·
'2Mi. West of CR-512 ' (1) ·
'NB SR-5 1mi. S of CR 708 ' (1) ·
'PBIA/I-95 Interchange ' (1) ·
'PUMP STA AT 20 MI BEND ' (1) ·
'SB SR-5 1mi. S of CR 708 ' (1) ·
'SR-415 - Alamana Canal ' (1) ·
'SR-91 OVER LAT CANAL 45 ' (1) ·
'Tpk/PGA Blvd interchange ' (1) ·
'Turnpike at Stuart exit. ' (1)
26221756 (1) ·
26252638 (1) ·
26360866 (1) ·
26410722 (1) ·
26411352 (1) ·
26412597 (1) ·
26420393 (1) ·
26442375 (1) ·
26492016 (1) ·
26492039 (1) ·
26502106 (1) ·
27023798 (1) ·
27023948 (1) ·
27094100 (1) ·
27101012 (1) ·
27123412 (1) ·
27333344 (1) ·
27333350 (1) ·
27333412 (1) ·
27333415 (1) ·
27382573 (1) ·
27382633 (1) ·
28555594 (1)
80035976 (1) ·
80042805 (1) ·
80070222 (1) ·
80070240 (1) ·
80074689 (1) ·
80085094 (1) ·
80101483 (1) ·
80101504 (1) ·
80101580 (1) ·
80101799 (1) ·
80102470 (1) ·
80121176 (1) ·
80181600 (1) ·
80200100 (1) ·
80214953 (1) ·
80321756 (1) ·
80403783 (1) ·
80403784 (1) ·
80434234 (1) ·
80434242 (1) ·
80454646 (1) ·
80454647 (1) ·
81063625 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 23 results in range #1 to #23.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)