Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-51 Canal ' (1) ·
'CANAL E-84 ' (1) ·
'COLLIER WATERWAY ' (1) ·
'E-2 Canal ' (1) ·
'Goat Creek ' (1) ·
'Hillsboro Canal ' (1) ·
'HILLSBORO CANAL L-14 ' (1) ·
'KELLER CANAL ' (1) ·
'L-12 Canal ' (1) ·
'Lake Ashby Canal ' (1) ·
'Lateral "B" Canal ' (1) ·
'LATERAL B CANAL ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'M-2 CANAL ' (1) ·
'N Fork Loxahatchee River' (1) ·
'SFWMD C-15 CANAL ' (1)
'12th Street ' (1) ·
'16TH ST ' (1) ·
'1st St SW ' (1) ·
'4th Street ' (1) ·
'5th Street ' (1) ·
'Benoist Farms Rd ' (1) ·
'BRANT DR/CARL BOTT' (1) ·
'CENTER DRIVE ' (1) ·
'CRESTHAVEN BLVD ' (1) ·
'DARWIN BLVD ' (1) ·
'ENGLAR DRIVE ' (1) ·
'Lake Ashby Road ' (1) ·
'Levee Road ' (1) ·
'NW 2ND ST ' (1) ·
'OKEECHOBEE BLVD. ' (1) ·
'Pioneer Road ' (1) ·
'Private Road ' (1) ·
'SE 7TH STREET ' (1) ·
'Tadlock Ave. ' (1) ·
'TEQUESTA DRIVE ' (1)
704191 (1) ·
794146 (1) ·
884066 (1) ·
884069 (1) ·
884073 (1) ·
884074 (1) ·
884075 (1) ·
885603 (1) ·
930360 (1) ·
930806 (1) ·
930812 (1) ·
934240 (1) ·
934326 (1) ·
934357 (1) ·
934711 (1) ·
934721 (1) ·
935100 (1) ·
935501 (1) ·
936776 (1) ·
945262 (1)
'.2MI S of LINDELL BLVD ' (1) ·
'0.1MI W OF SEM PRATT WHIT' (1) ·
'0.25 mi N of Valkaria Rd ' (1) ·
'0.5 Mi. E of Lyons Rd. ' (1) ·
'0.5 MI. E OF SR-80 ' (1) ·
'0.5Mi S of PAAR DRIVE ' (1) ·
'0.5MI W OF HAVERHILL ROAD' (1) ·
'0.9MI W OF SCHUMANN RD ' (1) ·
'1.0 Mi E of Nob Hill Road' (1) ·
'1.2MI. W of US-1 ' (1) ·
'200ft. East of SR-415 ' (1) ·
'20ft. E of 58th Ave/CR613' (1) ·
'4.0 MI NW OF US-441 ' (1) ·
'750FT W OF SR-7 (US-441) ' (1) ·
'At 58th Ave ' (1) ·
'At CR-613 ' (1) ·
'At CR-613 - 58th Ave ' (1) ·
'Benoist Farms Rd at SR-80' (1) ·
'IN JOHN PRINCE PARK ' (1)
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 20 results in range #1 to #20.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)