Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BOLLES CANAL (L-21) ' (1) ·
'Cypress Creek ' (1) ·
'FORK OF ST. LUCIE RIVER ' (1) ·
'Hillsboro Canal L14 ' (1) ·
'HOWARD CREEK ' (1) ·
'L-14 CANAL ' (1) ·
'LAKE MANGONIA CANAL ' (1) ·
'LWDD CANAL E-3 ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'PARK LATERAL CANAL ' (1) ·
'Sykes Creek ' (1) ·
'Tillman Canal ' (1)
'109TH STREET ' (1) ·
'97 TH STREET ' (1) ·
'CR-512 ' (1) ·
'Eldron Blvd ' (1) ·
'GUN CLUB RD ' (1) ·
'JOG ROAD ' (1) ·
'NB 1-95 (SR-9) ' (1) ·
'PALM B LAKE BVD EB' (1) ·
'PALM B LAKE BVD WB' (1) ·
'PRIMA VISTA BLVD. ' (1) ·
'PURDY LANE ' (1) ·
'SB I-95 (SR-9) ' (1) ·
'Sea Ray Drive ' (1) ·
'SR-15 Main St. ' (1) ·
'US-27 (SR-25) ' (1) ·
'WALLIS ROAD ' (1) ·
'WESTMORELAND BLVD ' (1)
704144 (1) ·
705907 (1) ·
884003 (1) ·
884064 (1) ·
884068 (1) ·
890115 (1) ·
890116 (1) ·
930338 (1) ·
930342 (1) ·
934203 (1) ·
934223 (1) ·
934224 (1) ·
934315 (1) ·
934322 (1) ·
937706 (1) ·
944012 (1) ·
945250 (1)
'0.3MI WEST OF CR-507 ' (1) ·
'0.5 mi N of Malabar Road ' (1) ·
'0.5 MI W OF HAVERHILL RD ' (1) ·
'0.6Mi W OF AUSTRALIAN AVE' (1) ·
'0.6MI W OF US-1 ' (1) ·
'0.8 MI N of LANTANA ROAD ' (1) ·
'0.9 MI W OF US-1 ' (1) ·
'1.9mi W of N Banana Ri Dr' (1) ·
'1MI W OF SR 809 ' (1) ·
'1MI W of SR809 MIL. TRL ' (1) ·
'2.5 miles North of SR-706' (1) ·
'9.2MI N OF SR-60 ' (1) ·
'AT 141st ST ' (1) ·
'At East Canal St. ' (1) ·
'US-27 OVER BOLLES CANAL ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
Bridge closed because of channel failure. Corrective action may put back in light service. (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 17 results in range #1 to #17.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)