Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'109TH STREET ' (1) ·
'97 TH STREET ' (1) ·
'CONGRESS AVE ' (1) ·
'CR-512 ' (1) ·
'Eldron Blvd ' (1) ·
'GUN CLUB RD ' (1) ·
'JOG ROAD ' (1) ·
'PALM B LAKE BVD EB' (1) ·
'PALM B LAKE BVD WB' (1) ·
'PRIMA VISTA BLVD. ' (1) ·
'PURDY LANE ' (1) ·
'SR-15 Main St. ' (1) ·
'SR-404 EB ' (1) ·
'SR-404 WB ' (1) ·
'US-27 (SR-25) ' (1) ·
'WALLIS ROAD ' (1)
700083 (1) ·
700149 (1) ·
705907 (1) ·
884003 (1) ·
884064 (1) ·
884068 (1) ·
930338 (1) ·
930342 (1) ·
934203 (1) ·
934223 (1) ·
934224 (1) ·
934315 (1) ·
934322 (1) ·
934470 (1) ·
937706 (1) ·
944012 (1)
'0.3MI WEST OF CR-507 ' (1) ·
'0.4MI S OF LINTON BLVD ' (1) ·
'0.5 mi N of Malabar Road ' (1) ·
'0.5 MI W OF HAVERHILL RD ' (1) ·
'0.6Mi W OF AUSTRALIAN AVE' (1) ·
'0.8 MI N of LANTANA ROAD ' (1) ·
'0.9 MI W OF US-1 ' (1) ·
'1MI W OF SR 809 ' (1) ·
'1MI W of SR809 MIL. TRL ' (1) ·
'9.2MI N OF SR-60 ' (1) ·
'AT 141st ST ' (1) ·
'At East Canal St. ' (1) ·
'SR-404 EB over SR-513 ' (1) ·
'SR-404 WB - SR-513 ' (1) ·
'US-27 OVER BOLLES CANAL ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 16 results in range #1 to #16.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)