Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BOLLES CANAL (L-21) ' (1) ·
'CSX-RR ' (1) ·
'EARMAN RIVER CANAL C-17 ' (1) ·
'Hillsboro Canal L14 ' (1) ·
'I-95 (SR 9) ' (1) ·
'Lake Ida / Canal E-4 ' (1) ·
'LATERAL C CANAL ' (1) ·
'LATERAL CANAL C ' (1) ·
'LATERAL CANAL D ' (1) ·
'LATERAL CANAL D ' (1) ·
'RELIEF CANAL ' (1) ·
'SR-91 (Fla's.Turnpike) ' (1) ·
'Tillman Canal ' (1)
705907 (1) ·
705908 (1) ·
790176 (1) ·
884016 (1) ·
884022 (1) ·
884023 (1) ·
884024 (1) ·
890114 (1) ·
890121 (1) ·
930237 (1) ·
930338 (1) ·
930342 (1) ·
937000 (1) ·
937002 (1)
'0.1 MI S of LIGHTHOUSE DR' (1) ·
'0.3Mi W of Alt-A1A/SR-811' (1) ·
'0.5 mi N of Malabar Rd. ' (1) ·
'0.5 mi N of Malabar Road ' (1) ·
'0.7 mi. W of I-95 ' (1) ·
'1.5 N of SW KANNER HWY ' (1) ·
'AT 4TH STREET ' (1) ·
'AT 74TH AVE. ' (1) ·
'At East Canal St. ' (1) ·
'CR 76A over I-95 ' (1) ·
'SR-44 over CSX-RR ' (1) ·
'US-27 OVER BOLLES CANAL ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 14 results in range #1 to #14.