Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
705913 (1) ·
705914 (1) ·
705915 (1) ·
705916 (1) ·
930269 (1) ·
930438 (1) ·
934291 (1) ·
934294 (1) ·
934296 (1) ·
935750 (1) ·
937358 (1) ·
937359 (1) ·
937361 (1) ·
937363 (1)
'0.1MI S OF OKEECHOBEE BL ' (1) ·
'0.2 mi S of Cocoa Street ' (1) ·
'0.2 mi S of Jupiter Blvd ' (1) ·
'0.5 MI W OF HAVERHILL RD ' (1) ·
'0.5 MILES WEST OF SR-809 ' (1) ·
'0.5mi. East of US-1 ' (1) ·
'0.6MI S OF OKEECHOBEE BLV' (1) ·
'1.0Mi. S of Malabar Rd NE' (1) ·
'1.2MI S OF OKEECHOBEE BL ' (1) ·
'1.5 Mi S of Malabar Rd. ' (1) ·
'175FT S of LAS PALMAS ST ' (1) ·
'180ft W of LAS PALMAS ST.' (1) ·
'2MI N OF OKEECHOBEE BLV ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1)
Showing below up to 14 results in range #1 to #14.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)