Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-15 CANAL ' (1) ·
'C-51 Canal ' (1) ·
'CANAL ' (1) ·
'CANAL C-17 ' (1) ·
'Canal C-47 ' (1) ·
'Canal C-48 ' (1) ·
'CR 782 Linton Blvd ' (1) ·
'E-3 CANAL ' (1) ·
'FECRR ' (1) ·
'ITCWD CANAL #1 ' (1) ·
'ITCWD CANAL #2 ' (1) ·
'ITCWD CANAL 3 ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'RELIEF CANAL ' (1) ·
'SR 91 TPK ' (1) ·
'SR-513 ' (1)
'BISCAYNE DRIVE ' (1) ·
'Boynton Bch Blvd. ' (1) ·
'Brittan Avenue ' (1) ·
'Caballero Ave ' (1) ·
'CONGRESS AVE ' (1) ·
'CR68 ORNG AV 156.1' (1) ·
'CRESTWOOD BLVD ' (1) ·
'CRESTWOOD BLVD. ' (1) ·
'Eldron Blvd ' (1) ·
'LA MANCHA AVE. ' (1) ·
'MADRID STREET ' (1) ·
'Military Trail ' (1) ·
'NB I 95 SR 9 ' (1) ·
'PARK AVE. W. ' (1) ·
'ROYAL PLM BH BL NB' (1) ·
'ROYAL PLM BH BL SB' (1) ·
'SR-404 EB ' (1) ·
'SR-404 WB ' (1) ·
'SR-405 EB ' (1) ·
'SR-405 WB ' (1)
700002 (1) ·
700083 (1) ·
700103 (1) ·
700149 (1) ·
705913 (1) ·
705914 (1) ·
705915 (1) ·
705916 (1) ·
930438 (1) ·
930460 (1) ·
930500 (1) ·
934164 (1) ·
934291 (1) ·
934294 (1) ·
934296 (1) ·
934470 (1) ·
935750 (1) ·
937358 (1) ·
937359 (1) ·
937361 (1) ·
937363 (1) ·
940056 (1)
'0.1MI S OF OKEECHOBEE BL ' (1) ·
'0.2 mi S of Cocoa Street ' (1) ·
'0.2 mi S of Jupiter Blvd ' (1) ·
'0.3MI W OF CONGRESS AVE ' (1) ·
'0.4MI S OF LINTON BLVD ' (1) ·
'0.5 MI W OF HAVERHILL RD ' (1) ·
'0.5 MILES WEST OF SR-809 ' (1) ·
'0.6MI S OF OKEECHOBEE BLV' (1) ·
'1.0Mi. S of Malabar Rd NE' (1) ·
'1.2MI S OF OKEECHOBEE BL ' (1) ·
'1.5 Mi S of Malabar Rd. ' (1) ·
'1.5 miles South of SR 806' (1) ·
'175FT S of LAS PALMAS ST ' (1) ·
'180ft W of LAS PALMAS ST.' (1) ·
'2.9 MI N OF SR-70 ' (1) ·
'2MI N OF OKEECHOBEE BLV ' (1) ·
'SR-404 EB over SR-513 ' (1) ·
'SR-404 WB - SR-513 ' (1) ·
'SR-405 EB - FECRR ' (1) ·
'SR-405 WB - FECRR ' (1) ·
'SR-80 & Military Trail ' (1)
26252844 (1) ·
26262220 (1) ·
26314057 (1) ·
26373441 (1) ·
26403700 (1) ·
26412599 (1) ·
26415366 (1) ·
26421351 (1) ·
26430840 (1) ·
26433343 (1) ·
26435320 (1) ·
26435409 (1) ·
26475062 (1) ·
27265121 (1) ·
27583729 (1) ·
27583761 (1) ·
27590343 (1) ·
27590359 (1) ·
28124563 (1) ·
28124610 (1) ·
28313962 (1) ·
28314033 (1)
80052000 (1) ·
80052450 (1) ·
80053227 (1) ·
80064300 (1) ·
80074708 (1) ·
80075210 (1) ·
80130371 (1) ·
80130890 (1) ·
80133989 (1) ·
80134000 (1) ·
80142395 (1) ·
80143409 (1) ·
80144092 (1) ·
80253838 (1) ·
80362348 (1) ·
80362349 (1) ·
80394165 (1) ·
80394182 (1) ·
80400209 (1) ·
80400429 (1) ·
80472690 (1) ·
80472715 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 22 results in range #1 to #22.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)