Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
890142 (1) ·
930269 (1) ·
930451 (1) ·
930800 (1) ·
934126 (1) ·
934228 (1) ·
934487 (1) ·
934981 (1) ·
935508 (1) ·
937714 (1)
'.2MI E OF HOMEWOOD ROAD ' (1) ·
'0.4MI W OF HAVERHILL BLVD' (1) ·
'0.4Mi. East of Congress A' (1) ·
'0.5MI N OF JUPITER BCH RD' (1) ·
'0.5mi. East of US-1 ' (1) ·
'0.8Mi W OF MILITARY TRAIL' (1) ·
'1.7mi W Forrest/Tangerine' (1) ·
'3 MI. east of SR-710 ' (1) ·
'3Mi. S of CR-717 ' (1) ·
'50FT W OF VILLAGE BLVD ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1)
Showing below up to 10 results in range #1 to #10.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)