Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
890038 (1) ·
890142 (1) ·
890143 (1) ·
930451 (1) ·
930800 (1) ·
934126 (1) ·
934228 (1) ·
934487 (1) ·
934981 (1) ·
935508 (1) ·
937714 (1)
'.2MI E OF HOMEWOOD ROAD ' (1) ·
'0.4MI W OF HAVERHILL BLVD' (1) ·
'0.4Mi. East of Congress A' (1) ·
'0.5MI N OF JUPITER BCH RD' (1) ·
'0.8Mi W OF MILITARY TRAIL' (1) ·
'1.7mi W Forrest/Tangerine' (1) ·
'3 MI. east of SR-710 ' (1) ·
'3Mi. S of CR-717 ' (1) ·
'50FT W OF VILLAGE BLVD ' (1) ·
'SR-714 East of Fla. Tpk. ' (1) ·
'SR-714 East of Fla. Tpke.' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1)
Showing below up to 11 results in range #1 to #11.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)