Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-51 Canal ' (1) ·
'DANFORTH CREEK ' (1) ·
'E-3 CANAL ' (1) ·
'El Rio Canal ' (1) ·
'Lateral C Canal ' (1) ·
'Lateral H Canal ' (1) ·
'LWDD E- 2W CANAL ' (1) ·
'LWDD E-2E Canal ' (1) ·
'LWDD E-2W CANAL ' (1) ·
'N Fork Loxahatchee River' (1) ·
'QUAIL COVEY ROAD ' (1) ·
'SR 882 Forest Hill Blvd ' (1) ·
'SR-91 N/S TPK ' (1) ·
'US-192 ' (1) ·
'WPB Drainage Canal ' (1)
'53rd Street ' (1) ·
'Benoist Farms Rd ' (1) ·
'CLINT MOORE RD WB ' (1) ·
'CLINT MOORE RD. EB' (1) ·
'CLINT MOORE RD. WB' (1) ·
'EB Lake Worth Rd. ' (1) ·
'I 95 SR 9 ' (1) ·
'I-95 ' (1) ·
'I-95 (SR 9) ' (1) ·
'MAPP ROAD ' (1) ·
'Oslo Rd (CR-606) ' (1) ·
'Spanish River Blvd' (1) ·
'SR91 On/Off Rmp106' (1) ·
'TEQUESTA DRIVE ' (1) ·
'Woolbright Road EB' (1) ·
'Woolbright Road WB' (1)
700209 (1) ·
884076 (1) ·
884083 (1) ·
894059 (1) ·
930294 (1) ·
930329 (1) ·
930540 (1) ·
931011 (1) ·
934468 (1) ·
934469 (1) ·
934711 (1) ·
934966 (1) ·
934967 (1) ·
934968 (1) ·
935222 (1) ·
936776 (1)
'0.1 MILE NORTH OF SR-714 ' (1) ·
'0.7MI W OF CONGRESS AVE ' (1) ·
'0.7MI W OF CONGRESS AVE.' (1) ·
'1 mi N Palm Bch Lake Blvd' (1) ·
'1 Mile East of Jog Rd. ' (1) ·
'1.2MI. W of US-1 ' (1) ·
'1.5Mi E of Military Trail' (1) ·
'1.6 Miles East of 58th Av' (1) ·
'1.9 Mi E of US-441 ' (1) ·
'1.9 Mile E of US441 ' (1) ·
'1.9 Miles East of US-441 ' (1) ·
'At CR-611 - 43rd Ave ' (1) ·
'Benoist Farms Rd at SR-80' (1) ·
'I-95 / SR 882 ' (1) ·
'I-95 over US-192 ' (1) ·
'SR-710 TPK Interchange ' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
1000 (1) ·
118848 (1) ·
15000 (1) ·
20300 (1) ·
23596 (1) ·
25813 (1) ·
28050 (1) ·
28275 (1) ·
29842 (1) ·
369555 (1) ·
37303 (1) ·
392110 (1) ·
43375 (1) ·
8293 (1)
Showing below up to 16 results in range #1 to #16.