Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'CENTRAL PK BL S EB' (1) ·
'CENTRL PK BL S WB' (1) ·
'CLINT MOORE RD ' (1) ·
'COUNTY LINE RD ' (1) ·
'CR-512 ' (1) ·
'JOG ROAD ' (1) ·
'JOG ROAD (NB) ' (1) ·
'JOG ROAD (SB) ' (1) ·
'MARGINAL RD ' (1) ·
'OLD DIXIE HWY ' (1) ·
'PROSPERITY FARMS R' (1) ·
'Spanish River Blvd' (1) ·
'SW 48th Avenue ' (1)
884067 (1) ·
894021 (1) ·
894061 (1) ·
934116 (1) ·
934214 (1) ·
934271 (1) ·
934272 (1) ·
934273 (1) ·
934911 (1) ·
934920 (1) ·
934921 (1) ·
934929 (1) ·
935223 (1)
'0.3Mi E of Military Trail' (1) ·
'0.3MI N OF N. LAKE BLVD. ' (1) ·
'0.3MI S OF PIONEER RD ' (1) ·
'0.6MI S of SOUTHERN BLVD ' (1) ·
'0.8mi. N of CR-714 ' (1) ·
'1.1MI S OF LINTON BLVD ' (1) ·
'2.5Mi W of US-1 ' (1) ·
'7MI NORTH OF SR-60 ' (1) ·
'AT SOUTHERN BLVD. ' (1) ·
'AT US-441 (SR-7) ' (1) ·
'AT US-441 SR-7 ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1)
Showing below up to 13 results in range #1 to #13.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)