Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Bessey Creek ' (1) ·
'C-15 CANAL ' (1) ·
'C-17 CANAL ' (1) ·
'Canal 29 (5 mile creek) ' (1) ·
'CANAL C-24 ' (1) ·
'Canoe Creek ' (1) ·
'CYPRESS CREEK #2 ' (1) ·
'E-1 Canal ' (1) ·
'EAST TURTLE CREEK ' (1) ·
'L-5 CANAL ' (1) ·
'LATERAL U CANAL ' (1) ·
'LOXAHATCHEE CREEK ' (1) ·
'LWDD CANAL E-1 ' (1) ·
'LWDD L-5 CANAL ' (1) ·
'Reed Canal ' (1) ·
'S. Fork St. Lucie River ' (1) ·
'SFWMD C-51 CANAL ' (1)
'CENTRAL PK BL S EB' (1) ·
'CENTRL PK BL S WB' (1) ·
'CLINT MOORE RD ' (1) ·
'COUNTY LINE RD ' (1) ·
'CR-512 ' (1) ·
'JOG ROAD ' (1) ·
'JOG ROAD (NB) ' (1) ·
'JOG ROAD (SB) ' (1) ·
'MARGINAL RD ' (1) ·
'OLD DIXIE HWY ' (1) ·
'PROSPERITY FARMS R' (1) ·
'Reed Ca Prk Ent Rd' (1) ·
'SAVONA BLVD. ' (1) ·
'Spanish River Blvd' (1) ·
'SR 68 (Orange Ave)' (1) ·
'SR-76 ' (1) ·
'SR-808 (Glades Rd)' (1) ·
'SR91 N/S TPK 117.5' (1) ·
'SR91 N/S TPK 119.1' (1) ·
'SW 48th Avenue ' (1)
796500 (1) ·
884067 (1) ·
890079 (1) ·
890127 (1) ·
894021 (1) ·
894061 (1) ·
930241 (1) ·
930401 (1) ·
934116 (1) ·
934214 (1) ·
934271 (1) ·
934272 (1) ·
934273 (1) ·
934911 (1) ·
934920 (1) ·
934921 (1) ·
934929 (1) ·
935223 (1) ·
940152 (1) ·
945256 (1)
'.25 mi East of I-95 ' (1) ·
'0.2 MI S OF MARTIN CO LIN' (1) ·
'0.3Mi E of Military Trail' (1) ·
'0.3MI N OF N. LAKE BLVD. ' (1) ·
'0.3MI S OF PIONEER RD ' (1) ·
'0.5MI N of GATLIN BLVD. ' (1) ·
'0.6MI S of SOUTHERN BLVD ' (1) ·
'0.8mi. N of CR-714 ' (1) ·
'1 mi. east I-95 on SR 68 ' (1) ·
'1.1MI S OF LINTON BLVD ' (1) ·
'1.3 MI N OF PLM BCH CO LI' (1) ·
'2.5Mi W of US-1 ' (1) ·
'7MI NORTH OF SR-60 ' (1) ·
'AT SOUTHERN BLVD. ' (1) ·
'AT US-441 (SR-7) ' (1) ·
'AT US-441 SR-7 ' (1) ·
'Intrsect w Reed Canal Rd ' (1) ·
'SR-808 at SR-7 Boca Raton' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1)
Showing below up to 20 results in range #1 to #20.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)