Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Bessey Creek ' (1) ·
'Canal 29 (5 mile creek) ' (1) ·
'Canoe Creek ' (1) ·
'Dirksen Dr ' (1) ·
'Dirksen Drive ' (1) ·
'E-1 Canal ' (1) ·
'L-5 CANAL ' (1) ·
'LATERAL U CANAL ' (1) ·
'LWDD CANAL E-1 ' (1) ·
'LWDD L-5 CANAL ' (1) ·
'Reed Canal ' (1) ·
'SR 706 & I-95/SR706 Ramp' (1) ·
'SR-91 Fl. Tpk ' (1)
'CENTRAL PK BL S EB' (1) ·
'CENTRL PK BL S WB' (1) ·
'CLINT MOORE RD ' (1) ·
'CR-512 ' (1) ·
'EB 706 To SB I-95 ' (1) ·
'I-4 EB ' (1) ·
'I-4 WB ' (1) ·
'JOG ROAD (NB) ' (1) ·
'JOG ROAD (SB) ' (1) ·
'MARGINAL RD ' (1) ·
'Reed Ca Prk Ent Rd' (1) ·
'Spanish River Blvd' (1) ·
'SR 68 (Orange Ave)' (1) ·
'SR-808 (Glades Rd)' (1) ·
'SW 48th Avenue ' (1) ·
'WB SR706 to SB I95' (1)
790042 (1) ·
790100 (1) ·
796500 (1) ·
884067 (1) ·
894061 (1) ·
930384 (1) ·
930390 (1) ·
930401 (1) ·
934214 (1) ·
934271 (1) ·
934272 (1) ·
934920 (1) ·
934921 (1) ·
934929 (1) ·
935223 (1) ·
940152 (1)
'0.3Mi E of Military Trail' (1) ·
'0.3MI S OF PIONEER RD ' (1) ·
'0.6MI S of SOUTHERN BLVD ' (1) ·
'0.8mi. N of CR-714 ' (1) ·
'1 mi. east I-95 on SR 68 ' (1) ·
'7MI NORTH OF SR-60 ' (1) ·
'AT US-441 (SR-7) ' (1) ·
'AT US-441 SR-7 ' (1) ·
'I-4 EB - Dirksen Dr ' (1) ·
'I-4 WB - Dirksen Drive ' (1) ·
'I-95 / SR 706 Interchange' (1) ·
'Intrsect w Reed Canal Rd ' (1) ·
'SR-808 at SR-7 Boca Raton' (1) ·
'Tpk. SR 706 Interchange ' (1)
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 16 results in range #1 to #16.