Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'21ST ST SW ' (1) ·
'65TH ST. ' (1) ·
'BRITT RD ' (1) ·
'COLUMBUS DR. ' (1) ·
'CR-508 (69TH ST.) ' (1) ·
'CR-510 WABASSO RD ' (1) ·
'CR-619 82ND AVE. ' (1) ·
'DAVIS ROAD ' (1) ·
'I-95 NB ' (1) ·
'INDIAN RIVER DRIVE' (1) ·
'KESTOR DR ' (1) ·
'ORANGE TREE DR ' (1) ·
'TROON DR ' (1) ·
'UNDALLO RD ' (1)
790229 (1) ·
880018 (1) ·
880044 (1) ·
880049 (1) ·
884039 (1) ·
884047 (1) ·
894000 (1) ·
935001 (1) ·
935002 (1) ·
937201 (1) ·
940020 (1) ·
945264 (1) ·
945266 (1) ·
945267 (1)
'0.1MI N OF CLUBHOUSE BLVD' (1) ·
'0.1MI S of SEAWAY DR A1A ' (1) ·
'0.1MI W of N QUICK CIRCLE' (1) ·
'0.3MI E OF DARWIN BLVD ' (1) ·
'0.3MI N of 10TH AVE N ' (1) ·
'0.3MI W of DARWIN BLVD. ' (1) ·
'0.7 MILE NORTH OF SR-60 ' (1) ·
'150FT S OF N CNTRY CLBDR ' (1) ·
'1Mi W of US-1 ' (1) ·
'25FT. EAST OF 66TH AVE. ' (1) ·
'3.2MI W OF US-1 ' (1) ·
'33FT E OF CR-611 43RD AVE' (1) ·
'CR-615 (66TH AVE.) ' (1) ·
'I-95 NB over SR-421 ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 14 results in range #1 to #14.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)