Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'COUNTRY CLUB DRIVE' (1) ·
'CR 613 (58TH AVE) ' (1) ·
'CR714 PALM CITY RD' (1) ·
'Emerson Ave 27th A' (1) ·
'Indiantown Road ' (1) ·
'MILITARY TRAIL NB ' (1) ·
'MILITARY TRAIL SB ' (1) ·
'OKEELANTA RD. ' (1) ·
'Old Dixie Highway ' (1) ·
'OLD GERMANTOWN RD ' (1) ·
'PROSPERITY FARMSRD' (1) ·
'SR91 SB TPK 100.15' (1)
880088 (1) ·
884053 (1) ·
884055 (1) ·
890039 (1) ·
930142 (1) ·
930359 (1) ·
930420 (1) ·
934135 (1) ·
934482 (1) ·
934522 (1) ·
934915 (1) ·
934916 (1) ·
934936 (1) ·
934937 (1)
'0.2MI S OF DONALD ROSS ' (1) ·
'0.4 MI W OF CONGRESS AVE ' (1) ·
'0.4MI N OF 49TH ST. ' (1) ·
'0.7MI N of Northlake Blvd' (1) ·
'0.9 MI N OF LAKE IDA ROAD' (1) ·
'0.9MI N OF LAKE IDA ROAD ' (1) ·
'1/2MI S of US-1 ' (1) ·
'1MI N OF CLINT MOORE RD ' (1) ·
'1MI N. of CLINT MOORE RD.' (1) ·
'2.3 Mi. East of I-95 ' (1) ·
'2.8MI S OF SR-60 ' (1) ·
'50FT. S OF 30TH STREET ' (1) ·
'AT US-27 ' (1) ·
'WEST PALM BEACH INTERCH. ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 14 results in range #1 to #14.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)