Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Canal ' (1) ·
'Carter's Canal ' (1) ·
'Drainage Canal ' (1) ·
'Indian River Relief ' (1) ·
'Little Tomoka River ' (1) ·
'Milner's Canal ' (1) ·
'Outfall ' (1) ·
'Outfall Ditch ' (1) ·
'POPPOLTON CREEK ' (1) ·
'Rockledge Canal ' (1) ·
'Rockledge Creek ' (1) ·
'Santiago Canal ' (1) ·
'Sunshine Canal ' (1) ·
'Sweetwater Creek ' (1) ·
'Tyson Creek ' (1) ·
'Wishbone Canal ' (1) ·
Brushy Canal (1) ·
Fiske Canal (1) ·
Palm Canal (1)
700046 (1) ·
700050 (1) ·
700055 (1) ·
700094 (1) ·
700095 (1) ·
700097 (1) ·
700098 (1) ·
700099 (1) ·
700100 (1) ·
700162 (1) ·
700163 (1) ·
700164 (1) ·
700172 (1) ·
700177 (1) ·
700951 (1) ·
790026 (1) ·
790113 (1) ·
790169 (1) ·
790173 (1) ·
890048 (1) ·
930523 (1)
'0.2 Miles East of US-1 ' (1) ·
'0.4 Mi S of Grant Rd. ' (1) ·
'0.5 Mi S of Micco Rd. ' (1) ·
'0.6mi East of Congress Av' (1) ·
'0.75 mi. E. of I-95 ' (1) ·
'1.15 Mi S of SR-520 ' (1) ·
'1.2 Mi N L.Washington Rd.' (1) ·
'1.2 Mi S of Grant Rd ' (1) ·
'1.5 Mi S of Grant Rd. ' (1) ·
'1.5 Mi. S of SR-514 ' (1) ·
'1.5 Miles North of SR-528' (1) ·
'2.2 Mi. S of Grant Rd. ' (1) ·
'2.2 Miles North of US-92 ' (1) ·
'2.4 Mi. S of SR-520 ' (1) ·
'2.4Mi N of Ind. River Co.' (1) ·
'2.9 Mi. N of US 92 ' (1) ·
'2.96 Mi. West of I-95 ' (1) ·
'By Indian Grove Dr. ' (1) ·
1.2 Mi S of Wickham R. (1) ·
1.5 MI S of Wickham Rd (1) ·
I-95 at Fiske Blvd. (1)
26465191 (1) ·
27111696 (1) ·
27505794 (1) ·
27515948 (1) ·
27533277 (1) ·
27540995 (1) ·
27542400 (1) ·
27550069 (1) ·
27584460 (1) ·
28045218 (1) ·
28094698 (1) ·
28123269 (1) ·
28124426 (1) ·
28173137 (1) ·
28194787 (1) ·
28204418 (1) ·
28255464 (1) ·
29064881 (1) ·
29123640 (1) ·
29140326 (1) ·
29152375 (1)
80044300 (1) ·
80151037 (1) ·
80344642 (1) ·
80353035 (1) ·
80353842 (1) ·
80354795 (1) ·
80355151 (1) ·
80355880 (1) ·
80360100 (1) ·
80370039 (1) ·
80422115 (1) ·
80424447 (1) ·
80424785 (1) ·
80443277 (1) ·
80463003 (1) ·
80470709 (1) ·
80491325 (1) ·
81012996 (1) ·
81031750 (1) ·
81055893 (1) ·
81095154 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1)
Deterioration or initial disintegration, minor chloride contamination, cracking with some leaching, or spalls on concrete or masonry walls and slabs. Local minor scouring at curtain walls, wingwalls or pipes. Metal culverts have a smooth curvature, non-symmetrical shape, significant corrosion or moderate pitting. (1) ·
Moderate to major deterioration or disintegration, extensive cracking and leaching or spalls on concrete or masonry walls and slabs. Minor settlement or misalignment. Noticeable scouring or erosion at curtain walls, wingwalls or pipes. Metal culverts have significant distortion and deflection in one section, significant corrosion or deep pitting (1) ·
Shrinkage cracks, light scaling and insignificant spalling which does not expose reinforcing steel. Insignificant damage caused by drift with no misalignment and not requiring corrective action. Some minor scouring has occured near curtain walls, wingwalls or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting. (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing by assessment, by calculation or by installation of properly designed countermeasures (1)
115378 (1) ·
117980 (1) ·
126655 (1) ·
141861 (1) ·
143138 (1) ·
146608 (1) ·
19258 (1) ·
40772 (1) ·
41206 (1) ·
51182 (1) ·
64195 (1) ·
74196 (1)
Showing below up to 21 results in range #1 to #21.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)