Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Canal - D ' (1) ·
'E-1 CANAL ' (1) ·
'El Rio Canal E-4 ' (1) ·
'FL. TPK. SR-91 ' (1) ·
'I 95 SR 9 ' (1) ·
'I-95 (SR-9)/CSXRR ' (1) ·
'ITCWD CANAL #1 ' (1) ·
'Jupiter Creek ' (1) ·
'Lake Ida / Canal E-4 ' (1) ·
'LATERAL CANAL #38 ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'Main Canal ' (1) ·
'SR 710 and CSX RR ' (1) ·
'SR-514 ' (1) ·
'SR-91 (Florida Turnpike)' (1) ·
'Sykes Creek ' (1)
'Boynton Bch Blvd ' (1) ·
'Boynton Bch Blvd. ' (1) ·
'CRESTWOOD BLVD. ' (1) ·
'Hypoluxo Rd ' (1) ·
'I-95 ' (1) ·
'Indiantown Road ' (1) ·
'LANTANA RD.CR-812 ' (1) ·
'NB I 95 SR 9 ' (1) ·
'PGA Blvd. (SR 786)' (1) ·
'Port St. Lucie Bld' (1) ·
'SR 812 Lantana Rd ' (1) ·
'SR 91 TPK 79.75 ' (1) ·
'SR-520 ' (1) ·
'SR-60 Osceola Blvd' (1) ·
'SR806 Atlantic Ave' (1) ·
'US-98 (SR-80) ' (1) ·
'W. CAMINO REAL ' (1)
700193 (1) ·
700202 (1) ·
880030 (1) ·
930069 (1) ·
930173 (1) ·
930215 (1) ·
930237 (1) ·
930265 (1) ·
930276 (1) ·
930307 (1) ·
930402 (1) ·
930420 (1) ·
930438 (1) ·
934296 (1) ·
934360 (1) ·
934406 (1) ·
940142 (1)
'0.1MI S OF OKEECHOBEE BL ' (1) ·
'0.5 MILES WEST OF SR-809 ' (1) ·
'0.7 mi. W of I-95 ' (1) ·
'0.75 mile South of SR 708' (1) ·
'2.0 MI SOUTH OF SR-806 ' (1) ·
'2.25Mi. W of US-1 ' (1) ·
'2.3 Mi. East of I-95 ' (1) ·
'4 miles west of SR 7 ' (1) ·
'ADJACENT TO US-441 ' (1) ·
'AT SR-809 / WCAMINOREA ' (1) ·
'Hypoluxo Rd over I 95&RR ' (1) ·
'I-95 - SR-514 ' (1) ·
'Just W. of Congress Ave.' (1) ·
'Lantana I 95 Interchange ' (1) ·
'Port St Lucie / FL TPK. ' (1) ·
'SR-520 - Sykes Creek ' (1) ·
'Tpk/PGA Blvd interchange ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 17 results in range #1 to #17.