Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'90th Ave. ' (1) ·
'BOYNTON CANAL ' (1) ·
'Clint Moore Road ' (1) ·
'CR 512 (Fellsmere Rd.) ' (1) ·
'Depot Ave & El Rio Canal' (1) ·
'Haverhill Rd. & U Turns ' (1) ·
'Jog Rd. & Turn Arounds ' (1) ·
'Lake Ida Road ' (1) ·
'LATERAL CANAL #30 ' (1) ·
'LOXAHATCHEE RIVER ' (1) ·
'S. R. 7 & Return Ramps ' (1) ·
'SR 809 (Military Trail) ' (1) ·
'SR-46 ' (1) ·
'SR802 Lake Worth Rd ' (1) ·
'SW 10th St. Lowson Blvd ' (1) ·
Addison Canal (1)
'I 95 SR 9 ' (1) ·
'I 95 SR 9 NB ' (1) ·
'I 95 SR 9 SB ' (1) ·
'I-95 ' (1) ·
'NB I 95 SR 9 ' (1) ·
'SB I-95 (SR 9) ' (1) ·
'SR 80-Southern Bvd' (1) ·
'SR 80/Southern Bld' (1) ·
'SR 80/Southern Bvd' (1) ·
'SR 9 (I-95) ' (1) ·
'SR-91 (TPK) 78.7 ' (1) ·
'SR91 N/S TPK 83.91' (1) ·
'SR91 N/S TPK 87.74' (1) ·
I-95 (1)
700229 (1) ·
700230 (1) ·
880101 (1) ·
880105 (1) ·
930261 (1) ·
930375 (1) ·
930457 (1) ·
930459 (1) ·
930496 (1) ·
930497 (1) ·
930502 (1) ·
930525 (1) ·
930527 (1) ·
931000 (1) ·
931009 (1) ·
931010 (1)
'0.5 mi N of Atlantic Ave ' (1) ·
'0.7 MI NORTH OF SR-804 ' (1) ·
'1.7 miles North of SR 706' (1) ·
'2 MI N OF GLADES RD/SR808' (1) ·
'2 mi. North of Lantana Rd' (1) ·
'2 miles west of Turnpike ' (1) ·
'2.0 mi S of SR-60 ' (1) ·
'2.12 MI NORTH OF SR-806 ' (1) ·
'3.8Mi S of Brevard Cty L ' (1) ·
'E Congress Ave & N SR 806' (1) ·
'E Congress Ave & S SR 806' (1) ·
'E Jog Rd. & W SR 80 ' (1) ·
'East Tpk & West SR 809 ' (1) ·
'I-95 over SR-46 ' (1) ·
'SW quadrant PB Int Airprt' (1) ·
I-95 over Addison Canal (1)
101541 (1) ·
104500 (1) ·
116000 (1) ·
19250 (1) ·
36500 (1) ·
43500 (1) ·
70815 (1) ·
72500 (1) ·
75500 (1) ·
76000 (1) ·
78500 (1) ·
79000 (1) ·
90900 (1) ·
98900 (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles by assessment, by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
122864 (1) ·
125788 (1) ·
130993 (1) ·
131860 (1) ·
136198 (1) ·
137065 (1) ·
157712 (1) ·
171592 (1) ·
176174 (1) ·
181308 (1) ·
201260 (1) ·
33399 (1) ·
63328 (1) ·
75473 (1)
Showing below up to 16 results in range #1 to #16.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)