Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'CANAL C-24 ' (1) ·
'CSX RR ' (1) ·
'E-1 CANAL ' (1) ·
'E-3 CANAL ' (1) ·
'FLORIDA TURNPIKE ' (1) ·
'FTPK & S Macedo Blvd. ' (1) ·
'I 95 SR 9 ' (1) ·
'I-95 ' (1) ·
'I-95 (SR-9)/CSXRR ' (1) ·
'ITCWD CANAL #1 ' (1) ·
'L-14 CANAL ' (1) ·
'LAKEWOOD E4 CANAL ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'LWDD E-4 CANAL ' (1)
'10th Ave. North ' (1) ·
'10th Ave North ' (1) ·
'Australian Ave. ' (1) ·
'BELVEDERE ROAD ' (1) ·
'CR-516 ' (1) ·
'CRESTWOOD BLVD. ' (1) ·
'Crosstown Parkway ' (1) ·
'Hypoluxo Rd ' (1) ·
'HYPOLUXO RD. ' (1) ·
'JOG ROAD ' (1) ·
'LINTON BLVD ' (1) ·
'LPGA Blvd ' (1) ·
'MARINA BLVD. ' (1) ·
'PORT ST LUCIE BLVD' (1) ·
'SW 15TH AVE ' (1) ·
'W. CAMINO REAL ' (1) ·
'Woolbright Road ' (1)
700188 (1) ·
790171 (1) ·
930260 (1) ·
930263 (1) ·
930301 (1) ·
930307 (1) ·
930529 (1) ·
934282 (1) ·
934296 (1) ·
934315 (1) ·
934344 (1) ·
934406 (1) ·
934461 (1) ·
934485 (1) ·
934943 (1) ·
944018 (1) ·
945272 (1)
'0.1MI S OF OKEECHOBEE BL ' (1) ·
'0.1Mi. E of Bayshore Blvd' (1) ·
'0.2MI W OF I-95 ' (1) ·
'0.5 MILE WEST OF JOG RD ' (1) ·
'0.5Mi W of MILITARY TRAIL' (1) ·
'0.5MI. W OF I-95 ' (1) ·
'0.8 MI N of LANTANA ROAD ' (1) ·
'10th Ave North over I 95 ' (1) ·
'10th Ave over I 95 ' (1) ·
'5.7MI W OF US-1 ' (1) ·
'50FT E OF SR-7 (US-441) ' (1) ·
'AT SR-809 / WCAMINOREA ' (1) ·
'CR-516 over I-95 ' (1) ·
'Hypoluxo Rd over I 95&RR ' (1) ·
'I 95 Exit 56 ' (1) ·
'LPGA Blvd. at I-95 ' (1) ·
'North of P. Beach Airport' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 17 results in range #1 to #17.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)