Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BOYNTON CANAL C-16 ' (1) ·
'C-15 CANAL ' (1) ·
'CANAL C-24 ' (1) ·
'Canal L-14 ' (1) ·
'E-1 CANAL ' (1) ·
'E-3 CANAL ' (1) ·
'FLORIDA TURNPIKE ' (1) ·
'FTPK & S Macedo Blvd. ' (1) ·
'ITCWD CANAL #1 ' (1) ·
'L-14 CANAL ' (1) ·
'LAKEWOOD E4 CANAL ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'LWDD E-4 Canal ' (1) ·
'LWDD LATERAL 14 CANAL ' (1)
'BELVEDERE ROAD ' (1) ·
'CONGRESS AVE ' (1) ·
'Congress Ave. ' (1) ·
'CRESTWOOD BLVD. ' (1) ·
'Crosstown Parkway ' (1) ·
'HYPOLUXO RD. ' (1) ·
'JOG ROAD ' (1) ·
'LANTANA RD.CR-812 ' (1) ·
'LINTON BLVD ' (1) ·
'Linton Blvd. ' (1) ·
'MARINA BLVD. ' (1) ·
'MILITARY TRAIL ' (1) ·
'PORT ST LUCIE BLVD' (1) ·
'SW 15TH AVE ' (1) ·
'W. CAMINO REAL ' (1)
930163 (1) ·
934282 (1) ·
934296 (1) ·
934315 (1) ·
934318 (1) ·
934344 (1) ·
934360 (1) ·
934406 (1) ·
934461 (1) ·
934470 (1) ·
934485 (1) ·
934491 (1) ·
934943 (1) ·
934986 (1) ·
944018 (1) ·
945272 (1)
'0.1MI S OF OKEECHOBEE BL ' (1) ·
'0.1Mi. E of Bayshore Blvd' (1) ·
'0.2MI W OF I-95 ' (1) ·
'0.4MI S OF LINTON BLVD ' (1) ·
'0.5 Mile West of I-95 ' (1) ·
'0.5 MILE WEST OF JOG RD ' (1) ·
'0.5Mi South of 6th Ave S ' (1) ·
'0.5Mi W of MILITARY TRAIL' (1) ·
'0.5MI. W OF I-95 ' (1) ·
'0.8 MI N of LANTANA ROAD ' (1) ·
'0.8Mi NORTH OF CR-804 ' (1) ·
'0.9MI S OF SR-802 ' (1) ·
'5.7MI W OF US-1 ' (1) ·
'50FT E OF SR-7 (US-441) ' (1) ·
'ADJACENT TO US-441 ' (1) ·
'AT SR-809 / WCAMINOREA ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 16 results in range #1 to #16.