Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
930029 (1) ·
930335 (1) ·
930495 (1) ·
930499 (1) ·
930500 (1) ·
930504 (1) ·
930521 (1) ·
930530 (1) ·
930531 (1) ·
934301 (1) ·
934348 (1) ·
934963 (1)
'.2mi East of US-27 ' (1) ·
'0.9MI W OF MILITARY TRAIL' (1) ·
'1 mile North of SR 704 ' (1) ·
'1.5 miles South of SR 806' (1) ·
'1Mi E of CR809/Military T' (1) ·
'1mi. N of North Lake Blvd' (1) ·
'Between N Lake/PGA Blvds.' (1) ·
'E Congress Ave & N SR 806' (1) ·
'I-95/SR 806 interchange ' (1) ·
'StriblingWay ovr E-1canal' (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 12 results in range #1 to #12.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)