Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-18 Canal ' (1) ·
'Canal 29 (5 mile creek) ' (1) ·
'CR 782 Linton Blvd ' (1) ·
'E-2-E Canal ' (1) ·
'E3-canal ' (1) ·
'EL RIO CANAL ' (1) ·
'Hillsboro Canal L14 ' (1) ·
'I 95 SR 9 ' (1) ·
'INTRACOASTAL WATERWAY ' (1) ·
'Lake Ida Road ' (1) ·
'LAT CANAL (LK WORTH INT)' (1) ·
'Palm Beach Lake Blvd ' (1) ·
'Palm Beach Lakes Blvd. ' (1) ·
'PGA Blvd SR 786 ' (1) ·
'SR 794 Yamato Rd ' (1) ·
'SR 806 (Atlantic Ave.) ' (1) ·
'SR-68 ' (1) ·
'WPB CANAL C-51 ' (1)
'CAMINO REAL ' (1) ·
'EB US 98 SR 80 ' (1) ·
'I 95 NB ' (1) ·
'I 95 SR 9 NB ' (1) ·
'I 95 SR 9 SB ' (1) ·
'KIRK ROAD ' (1) ·
'LINTON BLVD. ' (1) ·
'Melaleuca Lane ' (1) ·
'NB I-95 (S.R. 9) ' (1) ·
'NB I-95 (SR 9) ' (1) ·
'SB I 95 SR 9 ' (1) ·
'SB I-95 (S.R. 9) ' (1) ·
'SR 68 (Orange Ave)' (1) ·
'SR 91 TPK RMP 93.5' (1) ·
'SR-15 Main St. ' (1) ·
'SR806 Atlantic Ave' (1) ·
'WB US 98 SR 80 ' (1)
930032 (1) ·
930201 (1) ·
930322 (1) ·
930334 (1) ·
930335 (1) ·
930338 (1) ·
930386 (1) ·
930462 (1) ·
930495 (1) ·
930499 (1) ·
930504 (1) ·
930530 (1) ·
930531 (1) ·
930539 (1) ·
934361 (1) ·
934751 (1) ·
934960 (1) ·
940096 (1) ·
940097 (1) ·
940152 (1)
'0.2MI EAST OF US-1 (SR-5)' (1) ·
'0.3 mile South of SR 706 ' (1) ·
'0.4 MI W of US-1 ' (1) ·
'1 mi. east I-95 on SR 68 ' (1) ·
'1 mile North of SR 704 ' (1) ·
'1.1Mi W of Miltiary Trail' (1) ·
'1.5 miles South of SR 806' (1) ·
'1mi. N of North Lake Blvd' (1) ·
'300' E of FL Turnpike ' (1) ·
'At East Canal St. ' (1) ·
'AT SR-80 SOUTHERN BLVD ' (1) ·
'E Congress Ave & N SR 806' (1) ·
'I-95/SR 806 interchange ' (1) ·
'Just North of Exit 48 ' (1) ·
'Just North of SR70 on I95' (1) ·
'LAKE WORTH INTERCHANGE ' (1) ·
'SR 80 / I-95 Interchange ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
14314 (1) ·
148776 (1) ·
157018 (1) ·
17176 (1) ·
176174 (1) ·
181308 (1) ·
184778 (1) ·
20994 (1) ·
25331 (1) ·
26400 (1) ·
27066 (1) ·
36435 (1) ·
47280 (1) ·
49014 (1) ·
50848 (1) ·
68532 (1) ·
91351 (1)
Showing below up to 20 results in range #1 to #20.