Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Angle Rd - Belcher Canal' (1) ·
'Angle Rd.- Belcher Canal' (1) ·
'C-23 CANAL ' (1) ·
'Galiano Rd. & C-24 Canal' (1) ·
'Mercer Ave and CSX RR ' (1) ·
'Palmetto Park Road ' (1) ·
'SR-713 (King Hwy) ' (1) ·
'SR-76 ' (1) ·
'SR-91 (Fla's. Turnpike) ' (1) ·
'SR-91 (Fla's.Turnpike) ' (1) ·
'W Camino Real ' (1) ·
'W. Camino Real ' (1)
890110 (1) ·
890111 (1) ·
890121 (1) ·
890122 (1) ·
890129 (1) ·
930187 (1) ·
930198 (1) ·
930199 (1) ·
930488 (1) ·
940092 (1) ·
940093 (1) ·
940113 (1) ·
940162 (1)
'0.25 mi N of Belvedere Rd' (1) ·
'1.1 mi. N of Broward line' (1) ·
'1.1mil N. of Broward line' (1) ·
'1.5 Mi N/O SW Kanner Hwy ' (1) ·
'1.5 N of SW KANNER HWY ' (1) ·
'1.5mi N of SR-68 ' (1) ·
'2 mi. N of Gatlin Blvd. ' (1) ·
'2.5 mi. N of SR 70 ' (1) ·
'2mi. N of SR714 on I95 ' (1) ·
'2mi.N of SR714 on I95 ' (1) ·
'Boca Raton ' (1) ·
'South of St Lucie Canal ' (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 13 results in range #1 to #13.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)