Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'14TH STREET CANAL ' (1) ·
'Canoe Creek ' (1) ·
'El Rio Canal ' (1) ·
'Hidden Valley Canal C15 ' (1) ·
'I 95 SR 9 ' (1) ·
'ICWW ' (1) ·
'Intracoastal Waterway ' (1) ·
'LAT CANL #45(GLADES INT)' (1) ·
'Lateral A Canal ' (1) ·
'Lateral B Canal ' (1) ·
'LWDD E 3-1/2 CANAL ' (1) ·
'MAIN CANAL VERO BEACH ' (1) ·
'Military Trail & CSX RR ' (1) ·
'Palmetto Park Road ' (1) ·
'W Camino Real ' (1) ·
'W. Camino Real ' (1)
'16th St/College Ln' (1) ·
'Clint Moore Road ' (1) ·
'CR-603-IND RIV BLV' (1) ·
'CR-606 Oslo Rd ' (1) ·
'EB SR808 Glades Rd' (1) ·
'I 95 NB ' (1) ·
'I 95 SB ' (1) ·
'NW 13 ST ' (1) ·
'PALMETTO PARK ROAD' (1) ·
'Spanish River Blvd' (1) ·
'SR 91 TPK RMP 76.3' (1) ·
'SR-60 ' (1) ·
'SR-656 (17th St.) ' (1) ·
'US-1 (SR-5) ' (1) ·
'WB SR808 Glades Rd' (1)
880077 (1) ·
880085 (1) ·
880087 (1) ·
884054 (1) ·
884071 (1) ·
884084 (1) ·
930006 (1) ·
930187 (1) ·
930198 (1) ·
930199 (1) ·
930202 (1) ·
930246 (1) ·
930247 (1) ·
930248 (1) ·
930333 (1) ·
934908 (1) ·
935215 (1) ·
935222 (1) ·
935223 (1)
'0.03Mi E of NW 15TH AVE ' (1) ·
'0.3Mi E of Military Trail' (1) ·
'0.4 Mi. W of SR-A1A ' (1) ·
'0.6Mi. W of SR-A1A ' (1) ·
'0.75 Mile North of SR-60 ' (1) ·
'0.8 MILE EAST OF US-1 ' (1) ·
'1 mile N of SR 794 Yamato' (1) ·
'1.1 mi. N of Broward line' (1) ·
'1.1mil N. of Broward line' (1) ·
'1.4MI NORTH OF US-1 ' (1) ·
'1.5Mi E of Military Trail' (1) ·
'800 ft West of I 95 ' (1) ·
'AT BOCA RATON INTERCHANGE' (1) ·
'At CR-613 ' (1) ·
'Boca Raton ' (1) ·
'Inter 66th Ave/College Ln' (1) ·
'No. City Line Boca Raton ' (1) ·
'SR 808 / I 95 Interchange' (1) ·
'SR 808 I 95 Interchange ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 19 results in range #1 to #19.