Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-17 Canal ' (1) ·
'C. Stanley Weaver Canal ' (1) ·
'CANAL E-1 ' (1) ·
'CANAL E-4 ' (1) ·
'E-3 CANAL ' (1) ·
'Fla. Turnpike & 2 canals' (1) ·
'HILLSBORO L-14 CANAL ' (1) ·
'Intracoastal Waterway ' (1) ·
'LAKE OSBOURNE ' (1) ·
'LWDD C-17 CANAL ' (1) ·
'LWDD LATERAL 30 CANAL ' (1) ·
'LWDD LATERAL 32 CANAL ' (1) ·
'SR-524 ' (1)
'ARMONE PLACE ' (1) ·
'CONGRESS AVE SB ' (1) ·
'DUDA ROAD ' (1) ·
'EB Blue Heron Blvd' (1) ·
'EB Forest Hill Bld' (1) ·
'EB Lake Worth Rd. ' (1) ·
'EB PGA Blvd. ' (1) ·
'GATEWAY BLVD (WB) ' (1) ·
'LANTANA ROAD EB ' (1) ·
'LANTANA ROAD WB ' (1) ·
'MILITARY TR. SB ' (1) ·
'N. LAKE BLVD EB ' (1) ·
'N. LAKE BLVD WB ' (1) ·
'SR-528 WB ' (1) ·
'WB Lake Worth Rd. ' (1) ·
'WB PGA Blvd. ' (1)
700089 (1) ·
930106 (1) ·
930267 (1) ·
930268 (1) ·
930328 (1) ·
930329 (1) ·
930349 (1) ·
930468 (1) ·
934341 (1) ·
934342 (1) ·
934349 (1) ·
934489 (1) ·
934519 (1) ·
934931 (1) ·
934932 (1) ·
934934 (1) ·
935307 (1)
'0.2MI S OF LAKE IDA ROAD ' (1) ·
'0.3MI E OF CONGRESS BLVD ' (1) ·
'0.6 MI W OF I-95 ' (1) ·
'0.6 MI WEST OF I-95 ' (1) ·
'0.6 MILE WEST OF US-1 ' (1) ·
'0.7Mi N OF SR-804 ' (1) ·
'0.8 MI N OF LAKE IDA ROAD' (1) ·
'0.8MI E OF I-95 ' (1) ·
'0.8MI EAST OF I-95 ' (1) ·
'1 Mile East of I-95 ' (1) ·
'1 Mile East of Jog Rd. ' (1) ·
'1.7 mi. east of SR-7 ' (1) ·
'1000'W of SR5 & E ofSR811' (1) ·
'1mi. east of Jog Rd. ' (1) ·
'ADJ. TO N. SIDE OF SR-880' (1) ·
'AT SR-7 US-441 ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 17 results in range #1 to #17.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)