Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Cabana Colony Circle ' (1) ·
'Canal C-51 ' (1) ·
'Cougar Wildlife Crossing' (1) ·
'Deer Wildlife Crossing ' (1) ·
'E-2W Canal ' (1) ·
'E-4 Canal ' (1) ·
'Fla. Turnpike & 2 canals' (1) ·
'Lateral "A" Canal ' (1) ·
'Lateral "B" Canal ' (1) ·
'Lateral A Canal ' (1) ·
'Lateral C Canal ' (1) ·
'Mercer Ave and CSX RR ' (1) ·
'North Relief Canal ' (1) ·
'Old Dixie Hwy. & FEC RR ' (1) ·
'South Relief Canal ' (1) ·
'SR 811 & FEC RR ' (1) ·
'SR 91 TPK (PGA BV INT) ' (1) ·
'Tomoka River ' (1)
'37th Street ' (1) ·
'49th St Lindsey Rd' (1) ·
'4th Street ' (1) ·
'56th Place North ' (1) ·
'57th Street ' (1) ·
'5th Street SW ' (1) ·
'CR-611 (45th ST.) ' (1) ·
'CR-630 (41st St.) ' (1) ·
'CR605 Old Dixie ' (1) ·
'I 95 SR 9 SB ' (1) ·
'I-4 EB ' (1) ·
'I-4 WB ' (1) ·
'LittleRanchesTrail' (1) ·
'Old Boynton Road ' (1) ·
'Prosperity Farms R' (1) ·
'SR 400 WB ' (1) ·
'SR-400 ' (1) ·
'SR-5 (US-1) NB ' (1) ·
'SR91 NB TPK 109.5 ' (1) ·
'US-1 (SR-5) SB ' (1) ·
'W/B Atlantic Ave ' (1) ·
'WB Forest Hill Bld' (1) ·
'WB SR 786 ' (1)
790201 (1) ·
790202 (1) ·
790205 (1) ·
790207 (1) ·
880103 (1) ·
880104 (1) ·
884074 (1) ·
884082 (1) ·
884085 (1) ·
884086 (1) ·
884093 (1) ·
884101 (1) ·
884102 (1) ·
884103 (1) ·
884104 (1) ·
930440 (1) ·
930489 (1) ·
930492 (1) ·
930514 (1) ·
931013 (1) ·
934178 (1) ·
934981 (1) ·
935920 (1)
'0.25 mi N of Belvedere Rd' (1) ·
'0.4Mi. East of Congress A' (1) ·
'0.8Mi. N of PGA Blvd. ' (1) ·
'1.3 Mi. North of CR-606 ' (1) ·
'1.7 miles east of SR 7 ' (1) ·
'1st overpass east of I-95' (1) ·
'2.1 Miles S of Oslo Rd. ' (1) ·
'56th Place North ' (1) ·
'5th St. SW at CR-611 ' (1) ·
'At CR-613 ' (1) ·
'At CR-615 (66th Ave.) ' (1) ·
'At CR-615 (66th Ave) ' (1) ·
'At CR-615 (66th Avenue) ' (1) ·
'Atlantic Ave./Fl. Tpk. ' (1) ·
'I-4 EB over Tomoka River ' (1) ·
'i-4 WB - Cougar Crossing ' (1) ·
'I-4 WB over Tomoka River ' (1) ·
'Palm Beach Garden Interch' (1) ·
'South Side of US-98 ' (1) ·
'SR 400 WB over Deer Wildl' (1)
26271450 (1) ·
26315430 (1) ·
26390300 (1) ·
26405072 (1) ·
26413720 (1) ·
26503846 (1) ·
26503900 (1) ·
26512009 (1) ·
27332870 (1) ·
27332944 (1) ·
27354064 (1) ·
27361500 (1) ·
27363390 (1) ·
27393890 (1) ·
27400430 (1) ·
27403120 (1) ·
27405750 (1) ·
27413623 (1) ·
27415031 (1) ·
29060018 (1) ·
29064300 (1) ·
29090099 (1) ·
29090120 (1)
80040535 (1) ·
80041860 (1) ·
80050300 (1) ·
80054200 (1) ·
80074716 (1) ·
80102700 (1) ·
80102980 (1) ·
80134871 (1) ·
80220651 (1) ·
80220740 (1) ·
80231300 (1) ·
80254929 (1) ·
80260616 (1) ·
80264867 (1) ·
80274502 (1) ·
80274510 (1) ·
80274550 (1) ·
80274570 (1) ·
80274600 (1) ·
81051410 (1) ·
81051478 (1) ·
81083300 (1) ·
81091401 (1)
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 23 results in range #1 to #23.