Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BOYNTON CANAL ' (1) ·
'FL. TURNPIKE ' (1) ·
'Galiano Rd & C-24 Canal ' (1) ·
'Header Canal ' (1) ·
'L-38 CANAL ' (1) ·
'L-5 CANAL ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'LWDD L-30 CANAL ' (1) ·
'LWDD LATERAL 14 CANAL ' (1) ·
'M CANAL ' (1) ·
'N Fork St. Lucie River ' (1) ·
'Pine Street ' (1) ·
'SR 70 ' (1) ·
'SR-91 TPK-DRAINAGE CANAL' (1) ·
'SR-91 TPK/DRAINAGE CANAL' (1)
'HYPOLUXO ROAD EB ' (1) ·
'HYPOLUXO ROAD WB ' (1) ·
'JOG RD NB ' (1) ·
'JOG ROAD (NB) ' (1) ·
'JOG ROAD (SB) ' (1) ·
'JOG ROAD NB ' (1) ·
'JOG ROAD SB ' (1) ·
'LYONS ROAD ' (1) ·
'NB I-95 (SR-9) ' (1) ·
'SEMINOLE/PRATTWHT.' (1) ·
'SR-528 EB ' (1) ·
'SR91 NB TPK 153.1 ' (1) ·
'SW 18TH ST WB ' (1) ·
'SW 18TH ST. EB ' (1) ·
'WB Prt St Lucie Bd' (1) ·
'WB SR 70 ' (1) ·
'YAMATO RD EB ' (1) ·
'YAMATO RD WB ' (1)
700151 (1) ·
934151 (1) ·
934271 (1) ·
934313 (1) ·
934345 (1) ·
934346 (1) ·
934913 (1) ·
934925 (1) ·
934926 (1) ·
934938 (1) ·
934939 (1) ·
934945 (1) ·
934946 (1) ·
934951 (1) ·
934952 (1) ·
940114 (1) ·
940119 (1) ·
940135 (1) ·
940145 (1)
'0.6MI S of SOUTHERN BLVD ' (1) ·
'0.7MI N OF BOYNTON BEACH ' (1) ·
'0.7MI N OF BOYNTON BH BL ' (1) ·
'0.8MI N OF LANTANA ROAD ' (1) ·
'0.9MI W OF POWERLINE RD ' (1) ·
'1.0MI W OF MILITARY TRAIL' (1) ·
'1.9Mi S of WOOLBRIGHT ' (1) ·
'1MI S OF LINTON BLVD ' (1) ·
'2 mi. N of Gatlin Blvd. ' (1) ·
'2.6 MILES NORTH OF SR-710' (1) ·
'2.9MI W OF MILITARY TRAIL' (1) ·
'2mi. East of SR-91 ' (1) ·
'4MI N OF OKEECHOBEE BLVD.' (1) ·
'7.0 mi. W of FL Turnpike ' (1) ·
'SR-528 EB over Pine St. ' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations (including piles) on dry land well above flood water elevations. (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 19 results in range #1 to #19.