Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'EB SR80 & C-51 Canal ' (1) ·
'FL. TURNPIKE ' (1) ·
'Fla. Turnpike & 2 canals' (1) ·
'Galiano Rd & C-24 Canal ' (1) ·
'Intracoastal Waterway ' (1) ·
'Lake Washington Road ' (1) ·
'Service Rd & Canal ' (1) ·
'SR-91 TPK & BOCA RIO RD.' (1) ·
'SR-91 TPK-DRAINAGE CANAL' (1) ·
'SR-91 TPK/DRAINAGE CANAL' (1) ·
'SR-91/TPK & BOCA RIO RD.' (1) ·
'US-17-92 -St Johns River' (1) ·
'US-17-92-St Johns River ' (1) ·
Lake Washington Road (1)
'EB Forest Hill Bld' (1) ·
'EB SR706 ' (1) ·
'I-4 EB ' (1) ·
'I-4 WB ' (1) ·
'I-95 NB ' (1) ·
'NB I-95 (SR-9) ' (1) ·
'NB SR 807 ' (1) ·
'PALMETTO PK RD(EB)' (1) ·
'PALMETTO PK RD(WB)' (1) ·
'SB SR 807 ' (1) ·
'SR-401 NB ' (1) ·
'SW 18TH ST WB ' (1) ·
'SW 18TH ST. EB ' (1) ·
'WB Forest Hill Bld' (1) ·
'WB SR 706 ' (1) ·
'YAMATO RD EB ' (1) ·
'YAMATO RD WB ' (1) ·
I-95 SB (1)
700043 (1) ·
700117 (1) ·
700123 (1) ·
790196 (1) ·
790197 (1) ·
930453 (1) ·
930454 (1) ·
930475 (1) ·
930514 (1) ·
930532 (1) ·
934349 (1) ·
934907 (1) ·
934909 (1) ·
934925 (1) ·
934926 (1) ·
934945 (1) ·
934946 (1) ·
940114 (1)
'0.9MI W OF POWERLINE RD ' (1) ·
'1.7 mi. east of SR-7 ' (1) ·
'1.7 miles east of SR 7 ' (1) ·
'2 mi. N of Gatlin Blvd. ' (1) ·
'2.9MI W OF MILITARY TRAIL' (1) ·
'2MI E of SR-7 US-441 ' (1) ·
'I-4EB-US-17-92 St Johns R' (1) ·
'I-4WB-US-17-92 St Johns R' (1) ·
'I-95 NB -Lk Washington Rd' (1) ·
'Indiantown Rd./ICW ' (1) ·
'Indiantown Rd/ ICW ' (1) ·
'SE quadrant PB Int Airpt ' (1) ·
'SR-401 NB - Barge Canal ' (1) ·
I-95 SB -Lk Washington Rd (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1)
Bridge foundations (including piles) on dry land well above flood water elevations. (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles by assessment, by calculations or by installation of properly designed countermeasures. (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1)
Showing below up to 18 results in range #1 to #18.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)