Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Australian Ave and Canal' (1) ·
'Australian Avenue ' (1) ·
'Belvedere Rd to SB I-95 ' (1) ·
'CR-3 ' (1) ·
'I-95 ' (1) ·
'I-95 (SR-9) ' (1) ·
'NB I-95 to Belvedere Rd.' (1) ·
'SB I-95 To EB 706 ' (1) ·
'SR 706 & I-95/SR706 Ramp' (1) ·
'SR 706 To NB I 95 ' (1) ·
'SR 91 TPK(FT PIERCE INT)' (1) ·
'SR-404 ' (1)
'I 95 to PBIA Ramp ' (1) ·
'PBIA to I-95 Ramp ' (1) ·
'SB I 95 to SR 80 ' (1) ·
'SR 80 to NB I-95 ' (1) ·
'SR-404 EB ' (1) ·
'SR-404 WB ' (1) ·
'SR519NB(Fiske Blv)' (1) ·
'SR519SB(Fiske Blv)' (1) ·
'SR91 SB TPK 152.9 ' (1) ·
'US-1 NB ' (1) ·
'WB 706 To SB I-95 ' (1) ·
'WB SR706 to SB 95 ' (1) ·
'WB SR706 to SB I95' (1)
700079 (1) ·
700126 (1) ·
700141 (1) ·
700145 (1) ·
700176 (1) ·
930376 (1) ·
930380 (1) ·
930385 (1) ·
930390 (1) ·
930477 (1) ·
930478 (1) ·
930479 (1) ·
930480 (1) ·
940053 (1)
'0.3 mile North of SR 80 ' (1) ·
'FT PIERCE INTERCHANGE ' (1) ·
'I 95 SR 706 interchange ' (1) ·
'I-95 / SR 706 interchange' (1) ·
'Just N. of Southern Blvd ' (1) ·
'PBIA/I-95 Interchange ' (1) ·
'SR-404 EB over CR-3 ' (1) ·
'SR-404 WB over CR-3 ' (1) ·
'SR-519 NB I-95 ' (1) ·
'SR-519 SB I-95 ' (1) ·
'US-1 NB - SR-404 ' (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 14 results in range #1 to #14.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)