Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
700145 (1) ·
700210 (1) ·
700211 (1) ·
790022 (1) ·
790107 (1) ·
794016 (1) ·
930541 (1) ·
930542 (1) ·
930543 (1) ·
930544 (1) ·
930803 (1)
'.25 mi N of SR 706 ' (1) ·
'.3 mi N of SR 706 ' (1) ·
'0.25 N of SR 706 ' (1) ·
'0.4 mi S of Addison Drive' (1) ·
'03 mi N of SR 706 ' (1) ·
'6.0 Mi. West of US-27 ' (1) ·
'I-4 EB over I-95 ' (1) ·
'I-4 WB over I-95 ' (1) ·
'SR-404 EB over CR-3 ' (1) ·
'SR-A1A - George King Blvd' (1) ·
SR-A1A SB- George King (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 11 results in range #1 to #11.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)