Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-52 Canal ' (1) ·
'CANAL E-84 ' (1) ·
'FEC RR(Olympia Overpass)' (1) ·
'Indian River Relief East' (1) ·
'Indian River West Relief' (1) ·
'LEVEE NO.8 ' (1) ·
'Miami Canal L-25 ' (1) ·
'N Fork Loxahatchee River' (1) ·
'OUTFALL SLOUGH ' (1) ·
'SFWMD C-15 CANAL ' (1) ·
'SR 91 TPK ' (1) ·
'SR 91 TPK(FT PIERCE INT)' (1) ·
'SR-3 ' (1) ·
'SR-91 (Fl. Tpk.) ' (1) ·
'SR-91 N/S TPK ' (1)
'BRANT DR/CARL BOTT' (1) ·
'CR712 MDWYRD 150.3' (1) ·
'DARWIN BLVD ' (1) ·
'NB SR-5 (US-1) ' (1) ·
'SB SR-5 (US-1) ' (1) ·
'SR-404 EB ' (1) ·
'SR-404 WB ' (1) ·
'SR-528 ' (1) ·
'SR-528 EB ' (1) ·
'SR-60 EB ' (1) ·
'SR-60 WB ' (1) ·
'SR-714 ' (1) ·
'SR-80WB (Southern)' (1) ·
'SR91 NB TPK 178.03' (1) ·
'SR91 On/Off Rmp106' (1) ·
'SR91 SB TPK 152.9 ' (1) ·
'SR91 SB TPK 178.03' (1) ·
'TEQUESTA DRIVE ' (1) ·
'US-27/SR-80 NB ' (1) ·
'US-27/SR-80 SB ' (1)
700017 (1) ·
700076 (1) ·
700078 (1) ·
700111 (1) ·
700142 (1) ·
700144 (1) ·
880058 (1) ·
880066 (1) ·
880090 (1) ·
880091 (1) ·
890001 (1) ·
890021 (1) ·
890159 (1) ·
930407 (1) ·
930537 (1) ·
930538 (1) ·
931011 (1) ·
935501 (1) ·
936776 (1) ·
940050 (1) ·
940053 (1) ·
945262 (1)
'.2MI S of LINDELL BLVD ' (1) ·
'0.5Mi S of PAAR DRIVE ' (1) ·
'1.2MI. W of US-1 ' (1) ·
'15 MI S OF SR 60 ' (1) ·
'15 MI SOUTH OF SR 60 ' (1) ·
'2.6 MI S OF FT PIER INTCH' (1) ·
'2Mi West of CR-512 ' (1) ·
'2Mi. West of CR-512 ' (1) ·
'At John Stretch Park ' (1) ·
'FT PIERCE INTERCHANGE ' (1) ·
'NB SR-5 1mi. S of CR 708 ' (1) ·
'PUMP STA AT 20 MI BEND ' (1) ·
'SB SR-5 1mi. S of CR 708 ' (1) ·
'SR-404 EB - Indian River ' (1) ·
'SR-404 EB -Indian Riv Rel' (1) ·
'SR-404 WB - Indian River ' (1) ·
'SR-404 WB-Indian River ' (1) ·
'SR-528 EB over SR-3 ' (1) ·
'SR-528 WB over SR-3 ' (1) ·
'SR-710 TPK Interchange ' (1) ·
'Turnpike at Stuart exit. ' (1)
26252859 (1) ·
26410722 (1) ·
26414539 (1) ·
26414600 (1) ·
26481194 (1) ·
26572884 (1) ·
27023798 (1) ·
27023948 (1) ·
27094100 (1) ·
27130777 (1) ·
27222822 (1) ·
27243006 (1) ·
27333350 (1) ·
27333415 (1) ·
27382573 (1) ·
27382633 (1) ·
28121937 (1) ·
28122002 (1) ·
28122580 (1) ·
28122646 (1) ·
28241870 (1) ·
28241933 (1)
80045345 (1) ·
80061282 (1) ·
80070222 (1) ·
80070240 (1) ·
80075297 (1) ·
80181600 (1) ·
80212173 (1) ·
80214953 (1) ·
80230229 (1) ·
80240119 (1) ·
80383763 (1) ·
80383781 (1) ·
80392343 (1) ·
80392362 (1) ·
80403783 (1) ·
80403784 (1) ·
80422075 (1) ·
80422081 (1) ·
80434234 (1) ·
80434242 (1) ·
80482471 (1) ·
80482472 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 22 results in range #1 to #22.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)