Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C STANLEY WEAVER CANAL ' (1) ·
'C-23 CANAL ' (1) ·
'CITY OF WPB CANAL ' (1) ·
'FISHTAIL CANAL ' (1) ·
'Hillsboro (L-14) Canal ' (1) ·
'HOWARD CREEK ' (1) ·
'Indian River ' (1) ·
'Indian River Relief ' (1) ·
'KELLER (E-4) CANAL ' (1) ·
'LIPTOG CANAL ' (1) ·
'LWDD E-4 CANAL ' (1) ·
'LWDD L-14 Cnl ' (1) ·
'LWDD LAT 30 CANAL ' (1) ·
'OCEAN CANAL L-13 ' (1) ·
'SFC CANAL NO 1 ' (1) ·
'Sykes Creek ' (1)
'2nd AVENUE NORTH ' (1) ·
'AUSTRALIAN AVE NB ' (1) ·
'AUSTRALIAN AVE SB ' (1) ·
'BARWICK RD ' (1) ·
'DATE PALM ROAD ' (1) ·
'HAGEN RANCH ROAD ' (1) ·
'Haverhill Rd ' (1) ·
'KELLER ROAD ' (1) ·
'MURPHY RD ' (1) ·
'SAM SENTER RD ' (1) ·
'Sea Ray Drive ' (1) ·
'SR-715 ' (1) ·
'SR510 Wabasso Road' (1) ·
'VILLAGE BLVD (NB) ' (1) ·
'VILLAGE BLVD (SB) ' (1) ·
'W LAKE RD CR-717 ' (1) ·
'WESTMORELAND BLVD ' (1)
704144 (1) ·
880050 (1) ·
880052 (1) ·
894003 (1) ·
930471 (1) ·
934278 (1) ·
934359 (1) ·
934364 (1) ·
934455 (1) ·
934505 (1) ·
934513 (1) ·
934950 (1) ·
935203 (1) ·
936350 (1) ·
937703 (1) ·
937710 (1) ·
937711 (1) ·
945250 (1)
'0.2 MI W of I-95 ' (1) ·
'0.3MI S OF 45TH STREET ' (1) ·
'0.3MI S of ROYAL PALM WAY' (1) ·
'0.4MI S of Melaleuca Ln ' (1) ·
'0.5Mi E of SR807 Congress' (1) ·
'0.5Mi East of US-1 ' (1) ·
'0.6MI W OF US-1 ' (1) ·
'0.7MI N OF LAKE IDA ROAD ' (1) ·
'0.8MI N OF BOYNTON BCH BD' (1) ·
'1.1MI NW OF HIGH MEADOW ' (1) ·
'1.2MI East of US-1 ' (1) ·
'1.8MI W OF SR-15 ' (1) ·
'1.9mi W of N Banana Ri Dr' (1) ·
'2Mi S of 45TH ST CR-702 ' (1) ·
'6MI E OF BELLE GLADE ' (1) ·
'Belle Glade 1Mi W SR-80 ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
Bridge closed because of channel failure. Corrective action may put back in light service. (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1)
Showing below up to 18 results in range #1 to #18.