Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-44 Intake Canal ' (1) ·
'COLLIER WATERWAY ' (1) ·
'E-2 Canal ' (1) ·
'F.P.F.W.C.D. Canal No. 1' (1) ·
'Goat Creek ' (1) ·
'Hillsboro Canal ' (1) ·
'HILLSBORO CANAL L-14 ' (1) ·
'KELLER CANAL ' (1) ·
'Kings Road ' (1) ·
'Lake Ashby Canal ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'M-2 CANAL ' (1) ·
'SR 706 & I-95/SR706 Ramp' (1)
'CENTER DRIVE ' (1) ·
'CR726 (Citrus Blv)' (1) ·
'CRESTHAVEN BLVD ' (1) ·
'ENGLAR DRIVE ' (1) ·
'Lake Ashby Road ' (1) ·
'NW 2ND ST ' (1) ·
'OKEECHOBEE BLVD. ' (1) ·
'Pioneer Road ' (1) ·
'Private Road ' (1) ·
'SE 7TH STREET ' (1) ·
'SR-407 ' (1) ·
'SR-713 (Kings Hwy)' (1) ·
'Tadlock Ave. ' (1) ·
'WB SR706 to SB I95' (1)
700090 (1) ·
704191 (1) ·
794146 (1) ·
885603 (1) ·
894057 (1) ·
930360 (1) ·
930390 (1) ·
930812 (1) ·
934240 (1) ·
934326 (1) ·
934357 (1) ·
934721 (1) ·
935100 (1) ·
940143 (1)
'.5mi So. of St Lucie Blvd' (1) ·
'0.1MI W OF SEM PRATT WHIT' (1) ·
'0.25 mi N of Valkaria Rd ' (1) ·
'0.5 Mi. E of Lyons Rd. ' (1) ·
'0.5 MI. E OF SR-80 ' (1) ·
'0.5MI W OF HAVERHILL ROAD' (1) ·
'0.9MI W OF SCHUMANN RD ' (1) ·
'1.0 Mi E of Nob Hill Road' (1) ·
'1.74 Miles E of SR-710 ' (1) ·
'2.9 Mi East of SR-528 ' (1) ·
'200ft. East of SR-415 ' (1) ·
'750FT W OF SR-7 (US-441) ' (1) ·
'I-95 / SR 706 Interchange' (1) ·
'IN JOHN PRINCE PARK ' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 14 results in range #1 to #14.