Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BESSEY CREEK ' (1) ·
'C-51 Canal ' (1) ·
'Canal ' (1) ·
'Canal to Bulow Creek ' (1) ·
'Crane Creek Canal L-7 ' (1) ·
'Danforth Creek ' (1) ·
'Drainage Canal ' (1) ·
'E-2 Canal ' (1) ·
'Habitat Connectivity ' (1) ·
'Konomac Canal ' (1) ·
'MAPLE CREEK ' (1) ·
'Reed Canal ' (1) ·
'Sebastian Canal East ' (1) ·
'SR 91 TPK(OKEECH BV INT)' (1) ·
'Tidal Canal ' (1) ·
'Underhill Slough ' (1)
'CR-708 ' (1) ·
'EB SR - 714 ' (1) ·
'Fort Florida Road ' (1) ·
'Fountainhead Blvd.' (1) ·
'Hatton Road ' (1) ·
'Indian Rvrsd Pk Rd' (1) ·
'Island Drive ' (1) ·
'Lake Harney Road ' (1) ·
'MAPP RD ' (1) ·
'MURPHY RD ' (1) ·
'Old Kings Rd ' (1) ·
'Saul Street ' (1) ·
'Service Road ' (1) ·
'SR-40 EB ' (1) ·
'SR-40 WB ' (1) ·
'SR91 SB TPK 100.15' (1) ·
'WB SR - 714 ' (1) ·
'Wilden Road ' (1)
704085 (1) ·
705603 (1) ·
790194 (1) ·
790195 (1) ·
794050 (1) ·
794074 (1) ·
794162 (1) ·
796518 (1) ·
890112 (1) ·
890134 (1) ·
890135 (1) ·
894033 (1) ·
894063 (1) ·
894064 (1) ·
930142 (1) ·
934517 (1) ·
934552 (1) ·
936656 (1)
'.1 Mile W of US-A1A ' (1) ·
'0.1 mi E of Wickham Road ' (1) ·
'0.1 mi W of Fleming Grant' (1) ·
'0.4 mi N. of SR-80 ' (1) ·
'0.4MI NW OF HIGH MEADOW ' (1) ·
'0.7 Mi N of Old Dixie Hwy' (1) ·
'1 Mi. S of US-441 ' (1) ·
'1.7 Miles West of I-95 ' (1) ·
'1.9MI S of CR-714 ' (1) ·
'2.2 mi West of US-17/92 ' (1) ·
'2.5 mi East of TPK Exit ' (1) ·
'4 Mi South of Maytown Rd.' (1) ·
'At Reed Canal Road ' (1) ·
'Indian Riverside Park ' (1) ·
'SR-40 WB - Habitat Connec' (1) ·
'SR-40EB - Habitat Connect' (1) ·
'WEST PALM BEACH INTERCH. ' (1)
Bank and embankment protection is severely undermined. River control devices have severe damage. Large deposits of debris are in the channel. (1) ·
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Deterioration or initial disintegration, minor chloride contamination, cracking with some leaching, or spalls on concrete or masonry walls and slabs. Local minor scouring at curtain walls, wingwalls or pipes. Metal culverts have a smooth curvature, non-symmetrical shape, significant corrosion or moderate pitting. (1) ·
Large spalls, heavy scaling, wide cracks, considerable efflorescence or opened construction joint permitting loss of backfill. Considerable settlement or misalignment. Considerable scouring or erosion at curtain walls, wingwalls or pipes. Metal culverts have significant distortion and deflection throughout, extensive corrosion or deep pitting. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 18 results in range #1 to #18.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)