Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
885808 (1) ·
930472 (1) ·
930473 (1) ·
930474 (1) ·
930806 (1) ·
930807 (1) ·
930808 (1) ·
930809 (1) ·
930811 (1) ·
935209 (1) ·
935210 (1) ·
935508 (1)
'.2MI E OF HOMEWOOD ROAD ' (1) ·
'0.03Mi E of CYPRESS WAY ' (1) ·
'1.0 Mi South of CR-827 ' (1) ·
'13.5 Mi S/O S/B E of US27' (1) ·
'21.0 Mi North of US-27 ' (1) ·
'4.0 MI NW OF US-441 ' (1) ·
'6.3MI S of SoBay at US-27' (1) ·
'INSIDE RIVERSIDE PARK ' (1) ·
'SE quadrant PB Int Airprt' (1) ·
'SE quadrant PB Int Airpt ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1)
Showing below up to 12 results in range #1 to #12.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)