Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'6th Avenue South ' (1) ·
'C-24 Canal ' (1) ·
'C.S.X. R/R ' (1) ·
'CR 702 45th Street ' (1) ·
'CSX RR ' (1) ·
'FLORIDA TURNPIKE SR-91 ' (1) ·
'I-95 (S.R. 9) ' (1) ·
'I-95 (SR-9) ' (1) ·
'Northlake Blvd. ' (1) ·
'SR 60 ' (1) ·
'SR 708 (Blue Heron Blvd)' (1) ·
'SR 802 Lake Worth Rd ' (1) ·
'SR 882 Forest Hill Blvd ' (1) ·
'SR-806 Atlantic Ave ' (1) ·
'Summit Boulevard ' (1) ·
'WPB Drainage Canal ' (1)
880102 (1) ·
930262 (1) ·
930289 (1) ·
930292 (1) ·
930294 (1) ·
930300 (1) ·
930458 (1) ·
930516 (1) ·
930519 (1) ·
930520 (1) ·
930540 (1) ·
931006 (1) ·
934297 (1) ·
940160 (1) ·
940161 (1) ·
945274 (1)
'0.7 Mi. West of I-95 ' (1) ·
'1 mi N Palm Bch Lake Blvd' (1) ·
'1.0M S OF OKEECHOBEE BLVD' (1) ·
'1.3mi South of 10th Ave N' (1) ·
'2 mi. N of Lantana Rd ' (1) ·
'5.1 MI SOUTH OF SR-804 ' (1) ·
'At Exit 74 ' (1) ·
'At Exit 76 ' (1) ·
'Becker Rd/I-95 interchge ' (1) ·
'Between SR 710 and 786 ' (1) ·
'Between SR 80 and SR 882 ' (1) ·
'Crosstown Pkwy/I-95 ' (1) ·
'I-95 / SR 882 ' (1) ·
'I-95 over SR-60 ' (1) ·
'Just West of I 95 ' (1) ·
'W of I 95 on Woolbright ' (1)
115000 (1) ·
116000 (1) ·
160500 (1) ·
17500 (1) ·
17700 (1) ·
1800 (1) ·
213000 (1) ·
226000 (1) ·
232000 (1) ·
42000 (1) ·
43500 (1) ·
48500 (1) ·
5000 (1) ·
98900 (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
171592 (1) ·
199525 (1) ·
201260 (1) ·
278468 (1) ·
30363 (1) ·
30710 (1) ·
3123 (1) ·
369555 (1) ·
392110 (1) ·
402520 (1) ·
6000 (1) ·
72870 (1) ·
75473 (1) ·
84148 (1)
Showing below up to 16 results in range #1 to #16.