Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Canoe Creek ' (1) ·
'E-1 Canal ' (1) ·
'El Rio Canal ' (1) ·
'El Rio Canal (E-4) ' (1) ·
'Hidden Valley Canal C15 ' (1) ·
'I 95 SR 9 ' (1) ·
'INTRACOASTAL WATERWAY ' (1) ·
'LAT CANL #45(GLADES INT)' (1) ·
'LWDD E 3-1/2 CANAL ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'Military Trail & CSX RR ' (1) ·
'Palmetto Park Road ' (1) ·
'W Camino Real ' (1) ·
'W. Camino Real ' (1)
'Clint Moore Road ' (1) ·
'EB SR808 Glades Rd' (1) ·
'I 95 NB ' (1) ·
'I 95 SB ' (1) ·
'I 95 SR 9 ' (1) ·
'NW 13 ST ' (1) ·
'PALMETTO PARK ROAD' (1) ·
'PALMETTO PK RD ' (1) ·
'Spanish River Blvd' (1) ·
'SR 794 (Yamato Rd)' (1) ·
'SR 91 TPK RMP 76.3' (1) ·
'SR-808 (Glades Rd)' (1) ·
'US-1 (SR-5) ' (1) ·
'WB SR808 Glades Rd' (1)
930006 (1) ·
930015 (1) ·
930187 (1) ·
930198 (1) ·
930199 (1) ·
930202 (1) ·
930246 (1) ·
930247 (1) ·
930248 (1) ·
930251 (1) ·
930333 (1) ·
930401 (1) ·
934902 (1) ·
934908 (1) ·
935215 (1) ·
935222 (1) ·
935223 (1)
'0.03Mi E of NW 15TH AVE ' (1) ·
'0.25 miles S/O SR 794 ' (1) ·
'0.3Mi E of Military Trail' (1) ·
'0.8 MILE EAST OF US-1 ' (1) ·
'1 mile N of SR 794 Yamato' (1) ·
'1.1 mi. N of Broward line' (1) ·
'1.1mil N. of Broward line' (1) ·
'1.5Mi E of Military Trail' (1) ·
'800 ft West of I 95 ' (1) ·
'ADJ W SIDE MILITARY TRAIL' (1) ·
'AT BOCA RATON INTERCHANGE' (1) ·
'Boca Raton ' (1) ·
'E Congress Ave. & W I-95 ' (1) ·
'No. City Line Boca Raton ' (1) ·
'SR 808 / I 95 Interchange' (1) ·
'SR 808 I 95 Interchange ' (1) ·
'SR-808 at SR-7 Boca Raton' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 17 results in range #1 to #17.