Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-24 Canal ' (1) ·
'C-51 Canal ' (1) ·
'C.S.X. R/R ' (1) ·
'CSX RR ' (1) ·
'E-2W CANAL ' (1) ·
'FLORIDA TURNPIKE SR-91 ' (1) ·
'I-95 Rmp A C D G & CSXRR' (1) ·
'Kyoto Gardens Dr ' (1) ·
'Lantana Road ' (1) ·
'Ramps A G & C.S.X. RR ' (1) ·
'Ramps A&G/BelvedereRd/RR' (1) ·
'RCA Center Dr & FEC R/R ' (1) ·
'S-5 Discharge Canal ' (1) ·
'SR 60 ' (1) ·
'SR 802 Lake Worth Rd ' (1) ·
'SR-806 Atlantic Ave ' (1) ·
'SR-91 Fl. Tpk ' (1) ·
'Summit Boulevard ' (1) ·
SR-401 (1)
'Crosstown Parkway ' (1) ·
'EB 706 To SB I-95 ' (1) ·
'I 95 SR 9 NB ' (1) ·
'JOG ROAD ' (1) ·
'Lantana to I 95 SB' (1) ·
'Levee Road ' (1) ·
'NB I 95 SR 9 ' (1) ·
'NB I-95 to PBIA R ' (1) ·
'PBIA to SB I-95 ' (1) ·
'SB I-95 to PBIA ' (1) ·
'SBSR807 to EBSR80 ' (1) ·
'SR 804 ' (1) ·
'SR 811 to SB I 95 ' (1) ·
'SR 811 to SB I-95 ' (1) ·
'SR 9 (I-95) ' (1) ·
'SR-91 TPK NS 81.77' (1) ·
'SR91 SB OFF RP81.9' (1) ·
'SR91 SB ON RP 81.9' (1) ·
'Woolbright Road ' (1) ·
Overpass Ramp (1)
700218 (1) ·
880102 (1) ·
930262 (1) ·
930274 (1) ·
930289 (1) ·
930292 (1) ·
930300 (1) ·
930384 (1) ·
930473 (1) ·
930481 (1) ·
930482 (1) ·
930484 (1) ·
930493 (1) ·
930526 (1) ·
930811 (1) ·
931006 (1) ·
931007 (1) ·
931008 (1) ·
934297 (1) ·
945274 (1)
'0.25 MI N OF ATLANTIC AVE' (1) ·
'0.7 Mi. West of I-95 ' (1) ·
'1.0M S OF OKEECHOBEE BLVD' (1) ·
'2 mi. N of Lantana Rd ' (1) ·
'21.0 Mi North of US-27 ' (1) ·
'5.1 MI SOUTH OF SR-804 ' (1) ·
'Between SR 80 and SR 882 ' (1) ·
'I-95 over SR-60 ' (1) ·
'Just West of I 95 ' (1) ·
'Lantana I 95 Interchange ' (1) ·
'NW quad SR811/786 intchge' (1) ·
'PBIA/I-95 Interchange ' (1) ·
'SE quadrant PB Int Airprt' (1) ·
'Tpk. SR 706 Interchange ' (1) ·
'W of I 95 on Woolbright ' (1) ·
0.7 Mile N of SR-528 (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 20 results in range #1 to #20.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)