Drilldown: bridge data

From Indian River Lagoon Project
bridge data > Kind 043a: Other & Scour 113 : Bridge not over waterway. or Countermeasures have been installed to mitigate an existing problem with scour and to reduce the risk of bridge failure during a flood event. Instructions contained in a plan of action have been implemented to reduce the risk to users from a bridge failure during or immediately after a flood event.

Use the filters below to narrow your results.

ObjectID:
 
Status:
Place 004:
Direction 005e:
Features 006a:
Critical 006b:
Facility 007:
Number 008:
 
Location 009:
 
Latitude 016:
 
Longitude 017:
 
Owner 022:
Built 027:
Lanes 028a:
1 (1) · 10 (1) · 11 (1) · 12 (1) · 13 (1) · 2 (1) · 3 (1) · 4 (1) · 5 (1) · 6 (1) · 7 (1) · 8 (1) · 9 (1)
Traffic 029:
Traffic Year 030:
Kind 043a: (Click arrow to add another value)
Length 049:
Width 052:
Direction 102:
Scour 113: (Click arrow to add another value)
Future 114:
Future Year 115:
Clearance 116:

Showing below up to 250 results in range #1 to #250.

View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)

T


View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)