Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
700085 (1) ·
700102 (1) ·
700116 (1) ·
700156 (1) ·
790053 (1) ·
790105 (1) ·
790132 (1) ·
930381 (1) ·
930419 (1) ·
930528 (1) ·
930940 (1)
'0.1MI W of US-98 / SR-441' (1) ·
'3 MI NORTH OF PGA BLVD ' (1) ·
'Between SR704 and 12th St' (1) ·
'I-95 SB - CR-5A ' (1) ·
'N.OF PGA BLVD S.JUPITER ' (1) ·
'SR-40 over IWW ' (1) ·
'SR-405 EB - US-1 ' (1) ·
'SR-407 NB at SR-528 WB ' (1) ·
'SR-472 EB over I-4 ' (1) ·
'Tomoka Farms Rd - I-4 ' (1) ·
I-95 NB and CR-5A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 11 results in range #1 to #11.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)