Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Haverhill Rd. & U Turns ' (1) ·
'I 95 and SR 704 ' (1) ·
'I 95 SR 9 ' (1) ·
'I-4 EB Ramp B ' (1) ·
'I-95 ' (1) ·
'Indian River ' (1) ·
'Indian River IWW ' (1) ·
'Jog Rd. & Turn Arounds ' (1) ·
'Mercer Ave and CSX RR ' (1) ·
'SR 809 (Military Trail) ' (1) ·
'SR-91 Fl. Tpk ' (1) ·
'SR-91 N/S TPK ' (1) ·
'SR786 I95 I95 Ramps ' (1)
'Australian Ave. ' (1) ·
'Congress Avenue ' (1) ·
'EB 706 To SB I-95 ' (1) ·
'I 95 SR 9 NB ' (1) ·
'I 95 SR 9 SB ' (1) ·
'I-4 Ramp ' (1) ·
'I-4 WB ' (1) ·
'SR 80-Southern Bvd' (1) ·
'SR 80/Southern Bvd' (1) ·
'SR-520 EB ' (1) ·
'SR-528 WB ' (1) ·
'SR786 WB to SB I95' (1) ·
'SR91 On/Off Rmp106' (1) ·
'US-192 WB ' (1) ·
'WB SR704 to SB I95' (1)
700110 (1) ·
700137 (1) ·
700174 (1) ·
790023 (1) ·
790106 (1) ·
930384 (1) ·
930388 (1) ·
930457 (1) ·
930459 (1) ·
930469 (1) ·
930488 (1) ·
930489 (1) ·
930525 (1) ·
930528 (1) ·
930529 (1) ·
931011 (1)
'0.25 mi N of Belvedere Rd' (1) ·
'Between SR704 and 12th St' (1) ·
'E Jog Rd. & W SR 80 ' (1) ·
'East Tpk & West SR 809 ' (1) ·
'I 95 SR 786 Interchange ' (1) ·
'I-4 EB Ramp - I-95 ' (1) ·
'I-4 WB over I-4 EB Ramp B' (1) ·
'I-95 SR 704 interchange ' (1) ·
'North of P. Beach Airport' (1) ·
'SR 520 EB - Indian River ' (1) ·
'SR-528 WB - Indian River ' (1) ·
'SR-710 TPK Interchange ' (1) ·
'SW quadrant PB Int Airprt' (1) ·
'Tpk. SR 706 Interchange ' (1) ·
'US-192 WB-Indian River ' (1)
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
125788 (1) ·
130993 (1) ·
137065 (1) ·
14921 (1) ·
198658 (1) ·
19952 (1) ·
22555 (1) ·
23596 (1) ·
29495 (1) ·
32098 (1) ·
33486 (1) ·
36435 (1) ·
43375 (1) ·
44197 (1) ·
47712 (1)
Showing below up to 16 results in range #1 to #16.