Drilldown: bridge data

From Indian River Lagoon Project
bridge data > Kind 043a: Steel continuous & Scour 113: Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures

Use the filters below to narrow your results.

ObjectID:
Status:
Date:
County 003:
Route 005d:
Direction 005e:
Critical 006b:
Number 008:
Latitude 016:
Longitude 017:
Owner 022:
Built 027:
Lanes 028a:
Traffic 029:
Traffic Year 030:
Service On 042a:
Kind 043a: (Click arrow to add another value)
Length 049:
Width 052:
Deck 058:
Superstructure 059:
Substructure 060:
Culvert 062:
Inspect Date 090:
Direction 102:
Rebuilt 106:
Scour 113: (Click arrow to add another value)
Future 114:
Future Year 115:
Clearance 116:

Showing below up to 2 results in range #1 to #2.

View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)


View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)