Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
700218 (1) ·
790212 (1) ·
930202 (1) ·
930384 (1) ·
930469 (1) ·
930485 (1) ·
930488 (1) ·
930489 (1) ·
930494 (1) ·
930528 (1) ·
930529 (1)
'0.25 mi N of Belvedere Rd' (1) ·
'1 mile N of SR 794 Yamato' (1) ·
'Between SR704 and 12th St' (1) ·
'CR-4139 over I-4 ' (1) ·
'I-95 SR 704 interchange ' (1) ·
'North of Belvedere Rd ' (1) ·
'North of P. Beach Airport' (1) ·
'SB Ramp to WPB Airport ' (1) ·
'Tpk. SR 706 Interchange ' (1) ·
0.7 Mile N of SR-528 (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 11 results in range #1 to #11.