Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Haverhill Rd. & U Turns ' (1) ·
'I 95 and SR 704 ' (1) ·
'I 95 SR 9 ' (1) ·
'I-4 ' (1) ·
'Indian River IWW ' (1) ·
'Jog Rd. & Turn Arounds ' (1) ·
'Mercer Ave and CSX RR ' (1) ·
'Mercer Ave./CSX RR/Canal' (1) ·
'RCA Center Dr & FEC R/R ' (1) ·
'S. R. 7 & Return Ramps ' (1) ·
'SR 809 (Military Trail) ' (1)
'Australian Ave. ' (1) ·
'Belvede to NB I-95' (1) ·
'Congress Avenue ' (1) ·
'CR-4139 ' (1) ·
'I 95 SR 9 NB ' (1) ·
'I 95 SR 9 SB ' (1) ·
'SB I 95 Off Ramp ' (1) ·
'SR 80-Southern Bvd' (1) ·
'SR 80/Southern Bld' (1) ·
'SR 80/Southern Bvd' (1) ·
'SR 811 to SB I-95 ' (1) ·
'US-192 WB ' (1) ·
'WB SR704 to SB I95' (1)
700174 (1) ·
790212 (1) ·
930457 (1) ·
930459 (1) ·
930469 (1) ·
930485 (1) ·
930488 (1) ·
930489 (1) ·
930493 (1) ·
930494 (1) ·
930525 (1) ·
930527 (1) ·
930528 (1) ·
930529 (1)
'0.25 mi N of Belvedere Rd' (1) ·
'2 miles west of Turnpike ' (1) ·
'Between SR704 and 12th St' (1) ·
'CR-4139 over I-4 ' (1) ·
'E Jog Rd. & W SR 80 ' (1) ·
'East Tpk & West SR 809 ' (1) ·
'I-95 SR 704 interchange ' (1) ·
'North of Belvedere Rd ' (1) ·
'North of P. Beach Airport' (1) ·
'NW quad SR811/786 intchge' (1) ·
'SB Ramp to WPB Airport ' (1) ·
'SW quadrant PB Int Airprt' (1) ·
'US-192 WB-Indian River ' (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
10063 (1) ·
122864 (1) ·
125788 (1) ·
12666 (1) ·
130993 (1) ·
137065 (1) ·
198658 (1) ·
19952 (1) ·
23422 (1) ·
32098 (1) ·
33486 (1) ·
47712 (1) ·
5205 (1)
Showing below up to 14 results in range #1 to #14.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)