Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'CR-717 ' (1) ·
'CR708 SE BRIDGE RD' (1) ·
'CR712 MDWYRD 150.3' (1) ·
'E. CAMINO REAL ' (1) ·
'EB Spanish Rvr Bvd' (1) ·
'G BUSH BLVD(NE8TH)' (1) ·
'LINTON BLVD. ' (1) ·
'NB SR-5 (US-1) ' (1) ·
'SB SR-5 (US-1) ' (1) ·
'SR-3 ' (1) ·
'SR-401 SB ' (1) ·
'SR-44 ' (1) ·
'SR804 E Ocean Ave.' (1) ·
'SR91 SB TPK 134.32' (1) ·
'SR91 SB TPK 142.2 ' (1) ·
'WB Spanish River ' (1)
700030 (1) ·
700072 (1) ·
700201 (1) ·
790172 (1) ·
890001 (1) ·
890021 (1) ·
890068 (1) ·
890107 (1) ·
930026 (1) ·
930072 (1) ·
930154 (1) ·
930226 (1) ·
930322 (1) ·
930370 (1) ·
934408 (1) ·
940049 (1) ·
940050 (1)
'0.2MI EAST OF US-1 (SR-5)' (1) ·
'0.3MI E OF US-1 ' (1) ·
'0.6MI E OF US-1 ' (1) ·
'0.9 M E OF US-1 ON CR-708' (1) ·
'1 Mile S of Boynton Inlet' (1) ·
'1.2MI S PORT ST LUCIE BLV' (1) ·
'1.9 MI WEST OF SR-715 ' (1) ·
'2.6 MI S OF FT PIER INTCH' (1) ·
'EB SR800 .2mi West of A1A' (1) ·
'NB SR-5 1mi. S of CR 708 ' (1) ·
'SB SR-5 1mi. S of CR 708 ' (1) ·
'SR-3 NB over Barge Canal ' (1) ·
'SR-3 SB over Barge Canal ' (1) ·
'SR-401 SB - Barge Canal ' (1) ·
'SR-44 - Indian River ' (1) ·
'STUART TPK INTERCHANGE ' (1) ·
'WB SR800.2Mi west of US-1' (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 17 results in range #1 to #17.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)